Dashboard Contractor Registration

Contractor Application No. 64992 for Category Road Class A Applied Office : E-n-C Office Applied On Date : 30 May 2023

06 Jun 2023

Status : Registration Granted

By: Girish Chandra Arya

Approved as per the verification, approval and recommendation of concern officers and employees.

06 Jun 2023

Status : In-Process

By: Prem Singh Nabiyal

@Girish Chandra Arya(010099552) ji, Application has been forwarded to you, kindly do the needfull. comments : As per the recommendation of EE the approval for registration to Road Class A category may be accorded

06 Jun 2023

Status : In-Process

By: Prem Singh Nabiyal

@Girish Chandra Arya(010099552) ji, Application has been forwarded to you, kindly do the needfull. comments : As per the recommendation of EE the approval for registration to Road Class A category may be accorded

03 Jun 2023

Status : In-Process

By: Balram Misra

@Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : sir, SAO has examined and verified the relevant documents. Pay Slips are attached . so kindly consider for registration of contractor

01 Jun 2023

Status : In-Process

By: Gopal Singh Manral

@Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : अधिशासी अभियन्ता महोदय, फर्म द्वारा प्रस्तुत अभिलेखों का सत्यापन प्राप्त हो चुका है। अतः फर्म का मार्ग कार्य श्रेणी ए में पंजीकरण पर विचार करना चाहें।

31 May 2023

Status : In-Process

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

31 May 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

30 May 2023

Status : Reverted

By: Gopal Singh Manral

फर्म द्वारा प्रस्तुत डिग्रीधारी श्री पंकज गिरी जो अन्य फर्मो एवं ठेकेदारों के साथ कार्यरत है, मान्य नहीं है।

30 May 2023

Status : In-Process

By: Gopal Singh Manral

work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD has been approved by Gopal Singh Manral

30 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD

30 May 2023

Status : In-Process

By: Gopal Singh Manral

work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I has been approved by Gopal Singh Manral

30 May 2023

Status : In-Process

By: Gopal Singh Manral

work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II has been approved by Gopal Singh Manral

30 May 2023

Status : In-Process

By: Gopal Singh Manral

work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II has been approved by Gopal Singh Manral

30 May 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

30 May 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

29 May 2023

Status : Reverted

By: Gopal Singh Manral

अनुभव प्रमाण पत्र सही अपलोड किये जाने हेतु वापस

29 May 2023

Status : In-Process

By: Gopal Singh Manral

work IMPROVEMENT & DAMRIKARAN WORK OF GOLUCHHINA _ SHREKHET_BHITARKOT MOTOR ROAD has been approved by Gopal Singh Manral

27 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II

27 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD

27 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II

27 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work IMPROVEMENT & DAMRIKARAN WORK OF GOLUCHHINA _ SHREKHET_BHITARKOT MOTOR ROAD

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II

26 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I

25 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II

25 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I

25 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II

25 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II

25 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I

24 May 2023

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

24 May 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

22 May 2023

Status : Reverted

By: Gopal Singh Manral

फर्म द्वारा प्रस्तुत किये गये अनुभव प्रमाण पत्र में सम्बन्धित कार्यालय की ई-मेल आई0 सही अपलोड नहीं की गयी है।

19 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1

19 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1

19 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1

19 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1

19 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD

19 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD (STAGE_2)

19 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD (STAGE_2)

19 May 2023

Status : Submitted

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

19 May 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

15 May 2023

Status : Reverted

By: Gopal Singh Manral

repeat upload kiya gaya hai

15 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD

15 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD (STAGE_2)

15 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD (STAGE_2)

15 May 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1

12 May 2023

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

12 May 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

21 Apr 2023

Status : Reverted

By: Gopal Singh Manral

फर्म द्वारा ए0बी0 कन्स्ट्रक्शन पूर्व ही अपलोड किया गया है।

19 Apr 2023

Status : Submitted

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

19 Apr 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

13 Apr 2023

Status : Reverted

By: Gopal Singh Manral

फर्म द्वारा प्रस्तुत बैंक सोलवेन्सी फर्म के भागीदार के नाम से है, जो मान्य नहीं है। अतः बैंक सोलवेन्सी फर्म के नाम पर होनी चाहिए

12 Apr 2023

Status : Submitted

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

12 Apr 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

10 Apr 2023

Status : Reverted

By: Gopal Singh Manral

फर्म द्वारा प्रस्तुत पार्टनशिप डीड 2021 की है जबकि फर्म निबन्धक कार्यालय द्वारा प्रदत्त प्रमाण पत्र 12.11.2014 का है। संशोधित फर्म निबन्धक कार्यालय द्वारा प्रदत्त प्रमाण पत्र प्रस्तुत करें। तकनीकी स्टाफ की पे-स्लीप अपलोड नहीं की गयी है।

06 Apr 2023

Status : Submitted

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

06 Apr 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

01 Apr 2023

Status : Reverted

By: Gopal Singh Manral

एस0ओ0नी0 के अनुसार कार्यरत तकनीकी स्टाफ की पे-स्लीप अपलोड नहीं की गयी है। तकनीकी स्टाफ की पे-स्लीप अपलोड किये जाने हेतु वापस।

01 Apr 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1

01 Apr 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_2

01 Apr 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_2

31 Mar 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD

31 Mar 2023

Status : In-Process

By: Gopal Singh Manral

Mail Has been send for Verification of work IMPROVEMENT & DAMRIKARAN WORK OF GOLUCHHINA _ SHREKHET_BHITARKOT MOTOR ROAD

28 Mar 2023

Status : Comments

By: Manoj Barthwal

Application Forwarded to RTI Team.

28 Mar 2023

Status : Acknowledged

By: Manoj Barthwal

Application Acknoledged.

25 Mar 2023

Status : Reverted

By: Gopal Singh Manral

एस0ओ0पी0 के अनुसार तकनीकी स्टाफ का सैलरी स्लीप भी अपलोड किये जाने है। अतः सैलरी स्पीप अपलोड किये जाने हेतु प्रकरण वापस

24 Mar 2023

Status : Comments

By: Manoj Barthwal

Application Forwarded to RTI Team.

24 Mar 2023

Status : Comments

By: Manoj Barthwal

Application Forwarded to Select Team Team.

24 Mar 2023

Status : Acknowledged

By: Manoj Barthwal

Application Acknoledged.

24 Mar 2023

Status : Acknowledged

By: Manoj Barthwal

Application Acknoledged.

20 Mar 2023

Status : Reverted

By: Gopal Singh Manral

फर्म में कार्यरत श्री पंकज गिरी डिग्रीधारी नैनीताल कन्स्ट्रक्शन, नीरज मिश्रा के साथ भी कार्यरत है जो मान्य नहीं है।

16 Mar 2023

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to RTI Team.

16 Mar 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 06 Jun 2023 Girish Chandra Arya Registration Granted Approved as per the verification, approval and recommendation of concern officers and employees.
2 06 Jun 2023 Prem Singh Nabiyal In-Process @Girish Chandra Arya(010099552) ji, Application has been forwarded to you, kindly do the needfull. comments : As per the recommendation of EE the approval for registration to Road Class A category may be accorded
3 06 Jun 2023 Prem Singh Nabiyal In-Process @Girish Chandra Arya(010099552) ji, Application has been forwarded to you, kindly do the needfull. comments : As per the recommendation of EE the approval for registration to Road Class A category may be accorded
4 03 Jun 2023 Balram Misra In-Process @Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : sir, SAO has examined and verified the relevant documents. Pay Slips are attached . so kindly consider for registration of contractor
5 01 Jun 2023 Gopal Singh Manral In-Process @Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : अधिशासी अभियन्ता महोदय, फर्म द्वारा प्रस्तुत अभिलेखों का सत्यापन प्राप्त हो चुका है। अतः फर्म का मार्ग कार्य श्रेणी ए में पंजीकरण पर विचार करना चाहें।
6 31 May 2023 Yogamber Singh Rawat In-Process Application Forwarded to RTI Team.
7 31 May 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
8 30 May 2023 Gopal Singh Manral Reverted फर्म द्वारा प्रस्तुत डिग्रीधारी श्री पंकज गिरी जो अन्य फर्मो एवं ठेकेदारों के साथ कार्यरत है, मान्य नहीं है।
9 30 May 2023 Gopal Singh Manral In-Process work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD has been approved by Gopal Singh Manral
10 30 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD
11 30 May 2023 Gopal Singh Manral In-Process work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I has been approved by Gopal Singh Manral
12 30 May 2023 Gopal Singh Manral In-Process work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II has been approved by Gopal Singh Manral
13 30 May 2023 Gopal Singh Manral In-Process work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II has been approved by Gopal Singh Manral
14 30 May 2023 Yogamber Singh Rawat Acknowledged Application Forwarded to RTI Team.
15 30 May 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
16 29 May 2023 Gopal Singh Manral Reverted अनुभव प्रमाण पत्र सही अपलोड किये जाने हेतु वापस
17 29 May 2023 Gopal Singh Manral In-Process work IMPROVEMENT & DAMRIKARAN WORK OF GOLUCHHINA _ SHREKHET_BHITARKOT MOTOR ROAD has been approved by Gopal Singh Manral
18 27 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II
19 27 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD
20 27 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II
21 27 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I
22 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I
23 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II
24 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II
25 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II
26 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD
27 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I
28 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work IMPROVEMENT & DAMRIKARAN WORK OF GOLUCHHINA _ SHREKHET_BHITARKOT MOTOR ROAD
29 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD
30 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II
31 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II
32 26 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I
33 25 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II
34 25 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I
35 25 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_II
36 25 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_II
37 25 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_I
38 24 May 2023 Yogamber Singh Rawat Comments Application Forwarded to RTI Team.
39 24 May 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
40 22 May 2023 Gopal Singh Manral Reverted फर्म द्वारा प्रस्तुत किये गये अनुभव प्रमाण पत्र में सम्बन्धित कार्यालय की ई-मेल आई0 सही अपलोड नहीं की गयी है।
41 19 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1
42 19 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1
43 19 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1
44 19 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1
45 19 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD
46 19 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD (STAGE_2)
47 19 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD (STAGE_2)
48 19 May 2023 Yogamber Singh Rawat Submitted Application Forwarded to RTI Team.
49 19 May 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
50 15 May 2023 Gopal Singh Manral Reverted repeat upload kiya gaya hai
51 15 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD
52 15 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD (STAGE_2)
53 15 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD (STAGE_2)
54 15 May 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1
55 12 May 2023 Yogamber Singh Rawat Comments Application Forwarded to RTI Team.
56 12 May 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
57 21 Apr 2023 Gopal Singh Manral Reverted फर्म द्वारा ए0बी0 कन्स्ट्रक्शन पूर्व ही अपलोड किया गया है।
58 19 Apr 2023 Yogamber Singh Rawat Submitted Application Forwarded to RTI Team.
59 19 Apr 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
60 13 Apr 2023 Gopal Singh Manral Reverted फर्म द्वारा प्रस्तुत बैंक सोलवेन्सी फर्म के भागीदार के नाम से है, जो मान्य नहीं है। अतः बैंक सोलवेन्सी फर्म के नाम पर होनी चाहिए
61 12 Apr 2023 Yogamber Singh Rawat Submitted Application Forwarded to RTI Team.
62 12 Apr 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
63 10 Apr 2023 Gopal Singh Manral Reverted फर्म द्वारा प्रस्तुत पार्टनशिप डीड 2021 की है जबकि फर्म निबन्धक कार्यालय द्वारा प्रदत्त प्रमाण पत्र 12.11.2014 का है। संशोधित फर्म निबन्धक कार्यालय द्वारा प्रदत्त प्रमाण पत्र प्रस्तुत करें। तकनीकी स्टाफ की पे-स्लीप अपलोड नहीं की गयी है।
64 06 Apr 2023 Yogamber Singh Rawat Submitted Application Forwarded to RTI Team.
65 06 Apr 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
66 01 Apr 2023 Gopal Singh Manral Reverted एस0ओ0नी0 के अनुसार कार्यरत तकनीकी स्टाफ की पे-स्लीप अपलोड नहीं की गयी है। तकनीकी स्टाफ की पे-स्लीप अपलोड किये जाने हेतु वापस।
67 01 Apr 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF BUNGIDHAR MEHALCHAURI BACHHUWABAN MOTOR ROAD KM_25 TO SYUNI TALLI MOTOR ROAD STAGE_1
68 01 Apr 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF LOHAJANG TO BANK MOTOR ROAD STAGE_2
69 01 Apr 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION & MAINTENANCE OF GAUL TO MATHKOT MOTOR ROAD STAGE_2
70 31 Mar 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work CONSTRUCTION OF MALDHANCHAUR ANANDNAGAR TO THANDANALA ROAD
71 31 Mar 2023 Gopal Singh Manral In-Process Mail Has been send for Verification of work IMPROVEMENT & DAMRIKARAN WORK OF GOLUCHHINA _ SHREKHET_BHITARKOT MOTOR ROAD
72 28 Mar 2023 Manoj Barthwal Comments Application Forwarded to RTI Team.
73 28 Mar 2023 Manoj Barthwal Acknowledged Application Acknoledged.
74 25 Mar 2023 Gopal Singh Manral Reverted एस0ओ0पी0 के अनुसार तकनीकी स्टाफ का सैलरी स्लीप भी अपलोड किये जाने है। अतः सैलरी स्पीप अपलोड किये जाने हेतु प्रकरण वापस
75 24 Mar 2023 Manoj Barthwal Comments Application Forwarded to RTI Team.
76 24 Mar 2023 Manoj Barthwal Comments Application Forwarded to Select Team Team.
77 24 Mar 2023 Manoj Barthwal Acknowledged Application Acknoledged.
78 24 Mar 2023 Manoj Barthwal Acknowledged Application Acknoledged.
79 20 Mar 2023 Gopal Singh Manral Reverted फर्म में कार्यरत श्री पंकज गिरी डिग्रीधारी नैनीताल कन्स्ट्रक्शन, नीरज मिश्रा के साथ भी कार्यरत है जो मान्य नहीं है।
80 16 Mar 2023 Yogamber Singh Rawat Comments Application Forwarded to RTI Team.
81 16 Mar 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.