Dashboard Contractor Registration

Contractor Application No. 51227 for Category Road Class A Applied Office : E-n-C Office Applied On Date : 15 May 2023

02 Aug 2023

Status : In-Process

By: Kedar Singh

महोदय एफ०डी०आर० का सत्यापन मेल द्वारा प्राप्त हो चुका है | जो की अपलोड की जा चुकी है | अत: 2026 तक वैधता स्वीकृत करना चाहे |

23 May 2023

Status : Registration Granted

By: Girish Chandra Arya

Approved as per verification, approval and recommendation of concern officers and employees.

19 May 2023

Status : In-Process

By: Prem Singh Nabiyal

@Girish Chandra Arya(010099552) ji, Application has been forwarded to you, kindly do the needfull. comments : As per the recommendation of EE the registration may be accorded in the category A road works.

18 May 2023

Status : In-Process

By: Balram Misra

@Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : Pay slip of technical staff has been submitted by contractor. सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।

18 May 2023

Status : In-Process

By: Kedar Singh

@Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Sir, Pay slip of technical staff has been submitted by contractor. सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।

16 May 2023

Status : In-Process

By: Kedar Singh

@Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : SSO Sir, Pay slip of technical staff has been submitted by contractor. सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।

16 May 2023

Status : In-Process

By: Yogamber Singh Rawat

Application Forwarded to Parkeen Team.

16 May 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

29 Mar 2023

Status : Reverted

By: Kedar Singh

submit pay slip of technical staff

23 Mar 2023

Status : In-Process

By: Balram Misra

@Kedar Singh(010090330) ji, Application has been forwarded to you, kindly do the needfull. comments : As per clause 10 Appendix C of SOP of contractors registration please ensure to submit pay slip of technical staff and then put up

23 Mar 2023

Status : In-Process

By: Prem Singh Nabiyal

@Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : As per clause 10 Appendix C of SOP of contractors registration please ensure to submit pay slip of technical staff

23 Mar 2023

Status : In-Process

By: Balram Misra

@Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : Sir, Pay Slip of tech Staff not submitted but mentioned in Lump sum, so it may be looked into.

23 Mar 2023

Status : In-Process

By: Balram Misra

@Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : Application has been forwarded to you, kindly do the needfull. comments :Section में सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।

23 Mar 2023

Status : In-Process

By: Kedar Singh

@Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Sir सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।

15 Mar 2023

Status : In-Process

By: Kedar Singh

S.S.O. Sir सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।

15 Mar 2023

Status : In-Process

By: Kedar Singh

work Construction work of Sahiya_Patan_Samalta motor road. has been approved by Kedar Singh

14 Mar 2023

Status : In-Process

By: Kedar Singh

work Construction of Basan band to Basan M.R. upgradation work has been approved by Kedar Singh

14 Mar 2023

Status : In-Process

By: Kedar Singh

work Construction work of Panjitilani_Chibau_Khamroli Motor road Stage 1 in phase V package number U.T. 05_04 in district Dehradun under Pradhan Mantri Gram Sadak Yojna. has been approved by Kedar Singh

14 Mar 2023

Status : In-Process

By: Kedar Singh

work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt. has been approved by Kedar Singh

14 Mar 2023

Status : In-Process

By: Kedar Singh

work Expansion work from Sambhu ki Choki to Majhiya link road under Kalsi Vidhan sabha Chakrata in Dehradun has been approved by Kedar Singh

28 Feb 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

09 Feb 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

25 Jan 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

16 Jan 2023

Status : In-Process

By: Mahendra Kumar

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

09 Jan 2023

Status : In-Process

By: Mahendra Kumar

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

19 Dec 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

19 Dec 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.

15 Dec 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

15 Dec 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.

09 Dec 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

09 Dec 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.

30 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.

30 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

30 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction of Basan band to Basan M.R. upgradation work

30 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Expansion work from Sambhu ki Choki to Majhiya link road under Kalsi Vidhan sabha Chakrata in Dehradun

22 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction of Basan band to Basan M.R. upgradation work

22 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

22 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Panjitilani_Chibau_Khamroli Motor road Stage 1 in phase V package number U.T. 05_04 in district Dehradun under Pradhan Mantri Gram Sadak Yojna.

22 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.

22 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Expansion work from Sambhu ki Choki to Majhiya link road under Kalsi Vidhan sabha Chakrata in Dehradun

15 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction of Basan band to Basan M.R. upgradation work

15 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Panjitilani_Chibau_Khamroli Motor road Stage 1 in phase V package number U.T. 05_04 in district Dehradun under Pradhan Mantri Gram Sadak Yojna.

15 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.

15 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.

15 Nov 2022

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Expansion work from Sambhu ki Choki to Majhiya link road under Kalsi Vidhan sabha Chakrata in Dehradun

14 Nov 2022

Status : Comments

By: Anil Kumar Pangty

@Kedar Singh(010090330) ji, Application has been forwarded to you, kindly do the needfull. comments : समस्त अभिलेखों का सत्यापन कर प्रस्तुत करें।

13 Nov 2022

Status : Comments

By: Kedar Singh

@Anil Kumar Pangty(010096073) ji, Application has been forwarded to you, kindly do the needfull. comments : S.S.O Sir अनुभव प्रमाण पत्र/हेसियत/चरित्र प्रमाण पत्र के सत्यापन की कार्यवाही हेतु आदेशित करना चाहे।

03 Nov 2022

Status : Comments

By: Prem Lata Bisht

Application Forwarded to Parkeen Team.

03 Nov 2022

Status : Acknowledged

By: Prem Lata Bisht

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 02 Aug 2023 Kedar Singh In-Process महोदय एफ०डी०आर० का सत्यापन मेल द्वारा प्राप्त हो चुका है | जो की अपलोड की जा चुकी है | अत: 2026 तक वैधता स्वीकृत करना चाहे |
2 23 May 2023 Girish Chandra Arya Registration Granted Approved as per verification, approval and recommendation of concern officers and employees.
3 19 May 2023 Prem Singh Nabiyal In-Process @Girish Chandra Arya(010099552) ji, Application has been forwarded to you, kindly do the needfull. comments : As per the recommendation of EE the registration may be accorded in the category A road works.
4 18 May 2023 Balram Misra In-Process @Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : Pay slip of technical staff has been submitted by contractor. सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।
5 18 May 2023 Kedar Singh In-Process @Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Sir, Pay slip of technical staff has been submitted by contractor. सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।
6 16 May 2023 Kedar Singh In-Process @Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : SSO Sir, Pay slip of technical staff has been submitted by contractor. सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।
7 16 May 2023 Yogamber Singh Rawat In-Process Application Forwarded to Parkeen Team.
8 16 May 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
9 29 Mar 2023 Kedar Singh Reverted submit pay slip of technical staff
10 23 Mar 2023 Balram Misra In-Process @Kedar Singh(010090330) ji, Application has been forwarded to you, kindly do the needfull. comments : As per clause 10 Appendix C of SOP of contractors registration please ensure to submit pay slip of technical staff and then put up
11 23 Mar 2023 Prem Singh Nabiyal In-Process @Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : As per clause 10 Appendix C of SOP of contractors registration please ensure to submit pay slip of technical staff
12 23 Mar 2023 Balram Misra In-Process @Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : Sir, Pay Slip of tech Staff not submitted but mentioned in Lump sum, so it may be looked into.
13 23 Mar 2023 Balram Misra In-Process @Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : Application has been forwarded to you, kindly do the needfull. comments :Section में सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।
14 23 Mar 2023 Kedar Singh In-Process @Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Sir सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।
15 15 Mar 2023 Kedar Singh In-Process S.S.O. Sir सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।
16 15 Mar 2023 Kedar Singh In-Process work Construction work of Sahiya_Patan_Samalta motor road. has been approved by Kedar Singh
17 14 Mar 2023 Kedar Singh In-Process work Construction of Basan band to Basan M.R. upgradation work has been approved by Kedar Singh
18 14 Mar 2023 Kedar Singh In-Process work Construction work of Panjitilani_Chibau_Khamroli Motor road Stage 1 in phase V package number U.T. 05_04 in district Dehradun under Pradhan Mantri Gram Sadak Yojna. has been approved by Kedar Singh
19 14 Mar 2023 Kedar Singh In-Process work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt. has been approved by Kedar Singh
20 14 Mar 2023 Kedar Singh In-Process work Expansion work from Sambhu ki Choki to Majhiya link road under Kalsi Vidhan sabha Chakrata in Dehradun has been approved by Kedar Singh
21 28 Feb 2023 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
22 09 Feb 2023 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
23 25 Jan 2023 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
24 16 Jan 2023 Mahendra Kumar In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
25 09 Jan 2023 Mahendra Kumar In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
26 19 Dec 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
27 19 Dec 2022 Kedar Singh In-Process Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.
28 15 Dec 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
29 15 Dec 2022 Kedar Singh In-Process Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.
30 09 Dec 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
31 09 Dec 2022 Kedar Singh In-Process Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.
32 30 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.
33 30 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
34 30 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction of Basan band to Basan M.R. upgradation work
35 30 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Expansion work from Sambhu ki Choki to Majhiya link road under Kalsi Vidhan sabha Chakrata in Dehradun
36 22 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction of Basan band to Basan M.R. upgradation work
37 22 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
38 22 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Panjitilani_Chibau_Khamroli Motor road Stage 1 in phase V package number U.T. 05_04 in district Dehradun under Pradhan Mantri Gram Sadak Yojna.
39 22 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.
40 22 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Expansion work from Sambhu ki Choki to Majhiya link road under Kalsi Vidhan sabha Chakrata in Dehradun
41 15 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction of Basan band to Basan M.R. upgradation work
42 15 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Panjitilani_Chibau_Khamroli Motor road Stage 1 in phase V package number U.T. 05_04 in district Dehradun under Pradhan Mantri Gram Sadak Yojna.
43 15 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Under TSP, the work of conversion of Birmau Kandi light vehicle route into motorway and ashphaltizatio work in Dehradun Distt.
44 15 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Sahiya_Patan_Samalta motor road.
45 15 Nov 2022 Kedar Singh In-Process Mail Has been send for Verification of work Expansion work from Sambhu ki Choki to Majhiya link road under Kalsi Vidhan sabha Chakrata in Dehradun
46 14 Nov 2022 Anil Kumar Pangty Comments @Kedar Singh(010090330) ji, Application has been forwarded to you, kindly do the needfull. comments : समस्त अभिलेखों का सत्यापन कर प्रस्तुत करें।
47 13 Nov 2022 Kedar Singh Comments @Anil Kumar Pangty(010096073) ji, Application has been forwarded to you, kindly do the needfull. comments : S.S.O Sir अनुभव प्रमाण पत्र/हेसियत/चरित्र प्रमाण पत्र के सत्यापन की कार्यवाही हेतु आदेशित करना चाहे।
48 03 Nov 2022 Prem Lata Bisht Comments Application Forwarded to Parkeen Team.
49 03 Nov 2022 Prem Lata Bisht Acknowledged Application Acknoledged.