Contractor Application No. 44654 for Category Road Class A Applied Office : E-n-C Office Applied On Date : 02 Sep 2022

18 Sep 2022

Status : Registration Granted

By: Ashok Kumar

Approved provisionally

17 Sep 2022

Status : In-Process

By: Kunwar Singh Aswal

@Ashok Kumar(42270213M00002) ji, Application has been forwarded to you, kindly do the needfull. comments : RECOMMENDED FOR REGISTRATION IN ROAD CLASS -A.

16 Sep 2022

Status : In-Process

By: Raj Verdhan Tiwari

@Kunwar Singh Aswal(08001093) ji, Application has been forwarded to you, kindly do the needfull. comments : पत्र संख्या 940/अनु0 दिनांक 14.06.2022 का सत्यापन कार्यालय अधिशासी अभियन्ता निर्माण खण्ड लो0नि0वि0 पाबौ ने अपने पत्र संख्या 1064/अनु0 दिनांक 01.07.2022 द्वारा किया गया है। अतः अवलोकनार्थ एवं आवश्यक कार्यवाही हेतु प्रेषित।

16 Sep 2022

Status : In-Process

By: Basant Lal

@Raj Verdhan Tiwari(65005016) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय कृपया अवलोकनार्थ/आदेशार्थ प्रस्तुत।

16 Sep 2022

Status : In-Process

By: Narendra Pant

@Basant Lal(010022168) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय कृपया ठेकेदार द्वारा अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है अतः अवलोकनार्थ/आदेशार्थ प्रस्तुत।

16 Sep 2022

Status : In-Process

By: Narendra Pant

work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road has been approved by Narendra Pant

16 Sep 2022

Status : In-Process

By: Narendra Pant

work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road has been approved by Narendra Pant

16 Sep 2022

Status : In-Process

By: Narendra Pant

work thalisain mai gadoli gungari motor road work has been approved by Narendra Pant

16 Sep 2022

Status : In-Process

By: Narendra Pant

work Srinagar To jakh To Agroda Mote Road has been approved by Narendra Pant

16 Sep 2022

Status : In-Process

By: Narendra Pant

work Karnparyag Nauti Motar Marg has been approved by Narendra Pant

15 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road

15 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road

15 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work

15 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Srinagar To jakh To Agroda Mote Road

15 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Karnparyag Nauti Motar Marg

09 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road

09 Sep 2022

Status : In-Process

By: Narendra Pant

work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road has been dis-approved by Narendra Pant

09 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road

09 Sep 2022

Status : In-Process

By: Narendra Pant

work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road has been dis-approved by Narendra Pant

09 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work

09 Sep 2022

Status : In-Process

By: Narendra Pant

work thalisain mai gadoli gungari motor road work has been dis-approved by Narendra Pant

09 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Srinagar To jakh To Agroda Mote Road

09 Sep 2022

Status : In-Process

By: Narendra Pant

work Srinagar To jakh To Agroda Mote Road has been dis-approved by Narendra Pant

09 Sep 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Karnparyag Nauti Motar Marg

09 Sep 2022

Status : In-Process

By: Narendra Pant

work Karnparyag Nauti Motar Marg has been dis-approved by Narendra Pant

02 Sep 2022

Status : In-Process

By: Kunwar Singh Aswal

@Narendra Pant(42008142) ji, Application has been forwarded to you, kindly do the needfull. comments : VERIFICATION CERTIFICATE OF EXPERIENCE CERTIFICATE ARE NOT UPLOADED PROPERLY. VERIFICATION OF 940 IS MISSING.

02 Sep 2022

Status : In-Process

By: Basant Lal

@Kunwar Singh Aswal(08001093) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय कृपया अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है अतः अवलोकनार्थ/आदेशार्थ प्रस्तुत।

02 Sep 2022

Status : In-Process

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 3 Team.

02 Sep 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

01 Sep 2022

Status : Reverted

By: Kunwar Singh Aswal

ORGANIZATION NAME -SATINDER RAWAT GST TRADE NAME- SATENDRA SINGH PROPOSED ORGANIZATION NAME AND GST TRADE NAME ARE NOT MATCHING.

31 Aug 2022

Status : In-Process

By: Raj Verdhan Tiwari

@Kunwar Singh Aswal(08001093) ji, Application has been forwarded to you, kindly do the needfull. comments : वॉछित अभिलेखों का सत्यापन के उपरान्त अग्रिम कार्यवाही करना चाहें। आदेशार्थ प्रस्तुत।

31 Aug 2022

Status : In-Process

By: Basant Lal

@Raj Verdhan Tiwari(65005016) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय ठेकेदार द्वारा अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है। अतः अवलोकनार्थ/आदेशार्थ प्रस्तुत

31 Aug 2022

Status : In-Process

By: Narendra Pant

@Basant Lal(010022168) ji, Application has been forwarded to you, kindly do the needfull. comments : वरिष्ठ प्रशासनिक अधिकारी, महोदय ठेकेदार द्वारा अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है। अतः अवलोकनार्थ/आदेशार्थ प्रस्तुत

31 Aug 2022

Status : In-Process

By: Narendra Pant

work thalisain mai gadoli gungari motor road work has been approved by Narendra Pant

31 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work

31 Aug 2022

Status : In-Process

By: Narendra Pant

work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road has been approved by Narendra Pant

31 Aug 2022

Status : In-Process

By: Narendra Pant

work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road has been approved by Narendra Pant

26 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road

26 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road

26 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work

08 Aug 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 3 Team.

08 Aug 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

26 Jul 2022

Status : Reverted

By: Kunwar Singh Aswal

Experience certificate of work at S.No. 3 also includes bridge. After removing this component work experience becomes less than required amount. So, this experience certificate is not acceptable.

24 Jul 2022

Status : In-Process

By: Ashok Kumar

Experience certificate of work at S.No. 3 also includes bridge. After removing this component work experience becomes less than required amount. So, this experience certificate is not acceptable.

14 Jul 2022

Status : In-Process

By: Kunwar Singh Aswal

ALTHOUGH VERIFIED EXPERIENCE CERTIFICATES NO 1,2,5 ARE UPLOADED IMPROPERLY BUT ALL REQUIRED DOCUMENTS ARE AVAILABLE HENCE RECOMMENDED FOR APPROVAL OF REGISTRATION.

08 Jul 2022

Status : In-Process

By: Manoj Kumar Bisht

work verification done successfully Registration may be done .

07 Jul 2022

Status : In-Process

By: Basant Lal

work thalisain mai gadoli gungari motor road work has been approved by Basant Lal

07 Jul 2022

Status : In-Process

By: Basant Lal

work Thalisain Gadoli Gugri Moter Marg has been approved by Basant Lal

07 Jul 2022

Status : In-Process

By: Basant Lal

work Thalisain has been approved by Basant Lal

07 Jul 2022

Status : In-Process

By: Basant Lal

work Srinagar To jakh To Agroda Mote Road has been approved by Basant Lal

07 Jul 2022

Status : In-Process

By: Basant Lal

work Karnparyag Nauti Motar Marg has been approved by Basant Lal

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Thalisain

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Thalisain Gadoli Gugri Moter Marg

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Srinagar To jakh To Agroda Mote Road

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Karnparyag Nauti Motar Marg

01 Jul 2022

Status : Comments

By: Manoj Kumar Bisht

do verification

30 Jun 2022

Status : Comments

By: Narendra Pant

महोदय कृपया फर्म/ठेकेदार द्वारा एस0ओ0पी0 के अनुसार सभी अभिलेख अपलोड किये गये है अतः आदेश हो तो सम्बन्धित अभिलेख सत्यापन हेतु भेजे जा सकते है। कृपया आदेशार्थ प्रस्तुत।

30 Jun 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 3 Team.

30 Jun 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

25 Jun 2022

Status : Reverted

By: Kunwar Singh Aswal

PLEASE UPLOAD DEGREE OF MR.VIVEK KUMAR INSTEAD OF PROVISIONAL CERTIFICATE.

23 Jun 2022

Status : Comments

By: Narendra Pant

वरिष्ठ प्रशासनिक अधिकारी महोदय कृपया उक्त सम्बन्ध में अवगत कराना है कि एस0ओ0पी0 के अनुसार फर्म/ठेकेदार द्वारा अपलोड प्रपत्रों का परीक्षण किया गया है, जिनकी स्थिति निम्नानुसार हैः- 1. एस0ओ0पी0 के क्रमांक 4 के अनुसार फर्म/ठेकेदार द्वारा फोटो अपलोड की गयी है। 2. एस0ओ0पी0 के क्रमांक 5 के अनुसार चरित्र प्रमाण पत्र की प्रति अपलोड की गयी है। 3. एस0ओ0पी0 के क्रमांक 6 के अनुसार हैसियत प्रमाण पत्र उपजिलाधिकरी चाकीसैण जिला पौडी के पत्र दिनांक 22.04.2022 द्वारा जारी रू0 58,186.49 लाख की हैसियत प्रमाण पत्र प्रति अपलोड की गयी है। 4. एस0ओ0पी0 के क्रमांक 7 अनुसार फर्म/ठेकेदार द्वारा जी0एस0टी0 प्रमाण पत्र की प्रति अपलोड की गयी है। 6. एस0ओ0पी0 के क्रमांक 9 के अनुसार फर्म/ठेकेदार द्वारा मशीनरी की सूची दी गयी है। 7. एस0ओ0पी0 के क्रमांक 10 के अनुसार फर्म/ठेकेदार द्वारा तकनीकी स्टॉफ के शैक्षिक प्रमाण पत्र अपलोड किये गये है। (तकनीकी स्टाफ में कार्यरत श्री विजय कुमार का प्रोविजन सर्टिफिकेट की प्रति अपलोड की गयी है।) 8. एस0ओ0पी0 के क्रमांक 11 के अनुसार फर्म/ठेकेदार द्वारा अनुभव प्रमाण पत्र की प्रति अपलोड किये गये है। 9. एस0ओ0पी0 के क्रमांक 12 के अनुसार फर्म/ठेकेदार द्वारा जमानती धनराशि रू0 1.00 (रू0 एक लाख) मात्र का पूर्व में इस कार्यालय में जमा है। जिसका पुनः सम्बन्धित बैंक से सत्यापन किया जाना है। 10. एस0ओ0पी0 के क्रमांक 13 के अनुसार फर्म/ठेकेदार द्वारा वर्ष 2021-22 की आई0टी0आर0 की प्रति अपलोड की गयी है। अतः उपरोक्तानुसार अवलोकनार्थ/आदेशार्थ प्रस्तुत।

20 Jun 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 3 Team.

20 Jun 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

18 Jun 2022

Status : Reverted

By: Yogamber Singh Rawat

document not submitted.

18 Jun 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 18 Sep 2022 Ashok Kumar Registration Granted Approved provisionally
2 17 Sep 2022 Kunwar Singh Aswal In-Process @Ashok Kumar(42270213M00002) ji, Application has been forwarded to you, kindly do the needfull. comments : RECOMMENDED FOR REGISTRATION IN ROAD CLASS -A.
3 16 Sep 2022 Raj Verdhan Tiwari In-Process @Kunwar Singh Aswal(08001093) ji, Application has been forwarded to you, kindly do the needfull. comments : पत्र संख्या 940/अनु0 दिनांक 14.06.2022 का सत्यापन कार्यालय अधिशासी अभियन्ता निर्माण खण्ड लो0नि0वि0 पाबौ ने अपने पत्र संख्या 1064/अनु0 दिनांक 01.07.2022 द्वारा किया गया है। अतः अवलोकनार्थ एवं आवश्यक कार्यवाही हेतु प्रेषित।
4 16 Sep 2022 Basant Lal In-Process @Raj Verdhan Tiwari(65005016) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय कृपया अवलोकनार्थ/आदेशार्थ प्रस्तुत।
5 16 Sep 2022 Narendra Pant In-Process @Basant Lal(010022168) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय कृपया ठेकेदार द्वारा अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है अतः अवलोकनार्थ/आदेशार्थ प्रस्तुत।
6 16 Sep 2022 Narendra Pant In-Process work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road has been approved by Narendra Pant
7 16 Sep 2022 Narendra Pant In-Process work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road has been approved by Narendra Pant
8 16 Sep 2022 Narendra Pant In-Process work thalisain mai gadoli gungari motor road work has been approved by Narendra Pant
9 16 Sep 2022 Narendra Pant In-Process work Srinagar To jakh To Agroda Mote Road has been approved by Narendra Pant
10 16 Sep 2022 Narendra Pant In-Process work Karnparyag Nauti Motar Marg has been approved by Narendra Pant
11 15 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road
12 15 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road
13 15 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work
14 15 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work Srinagar To jakh To Agroda Mote Road
15 15 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work Karnparyag Nauti Motar Marg
16 09 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road
17 09 Sep 2022 Narendra Pant In-Process work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road has been dis-approved by Narendra Pant
18 09 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road
19 09 Sep 2022 Narendra Pant In-Process work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road has been dis-approved by Narendra Pant
20 09 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work
21 09 Sep 2022 Narendra Pant In-Process work thalisain mai gadoli gungari motor road work has been dis-approved by Narendra Pant
22 09 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work Srinagar To jakh To Agroda Mote Road
23 09 Sep 2022 Narendra Pant In-Process work Srinagar To jakh To Agroda Mote Road has been dis-approved by Narendra Pant
24 09 Sep 2022 Narendra Pant In-Process Mail Has been send for Verification of work Karnparyag Nauti Motar Marg
25 09 Sep 2022 Narendra Pant In-Process work Karnparyag Nauti Motar Marg has been dis-approved by Narendra Pant
26 02 Sep 2022 Kunwar Singh Aswal In-Process @Narendra Pant(42008142) ji, Application has been forwarded to you, kindly do the needfull. comments : VERIFICATION CERTIFICATE OF EXPERIENCE CERTIFICATE ARE NOT UPLOADED PROPERLY. VERIFICATION OF 940 IS MISSING.
27 02 Sep 2022 Basant Lal In-Process @Kunwar Singh Aswal(08001093) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय कृपया अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है अतः अवलोकनार्थ/आदेशार्थ प्रस्तुत।
28 02 Sep 2022 Yogamber Singh Rawat In-Process Application Forwarded to Niyojan 3 Team.
29 02 Sep 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
30 01 Sep 2022 Kunwar Singh Aswal Reverted ORGANIZATION NAME -SATINDER RAWAT GST TRADE NAME- SATENDRA SINGH PROPOSED ORGANIZATION NAME AND GST TRADE NAME ARE NOT MATCHING.
31 31 Aug 2022 Raj Verdhan Tiwari In-Process @Kunwar Singh Aswal(08001093) ji, Application has been forwarded to you, kindly do the needfull. comments : वॉछित अभिलेखों का सत्यापन के उपरान्त अग्रिम कार्यवाही करना चाहें। आदेशार्थ प्रस्तुत।
32 31 Aug 2022 Basant Lal In-Process @Raj Verdhan Tiwari(65005016) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय ठेकेदार द्वारा अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है। अतः अवलोकनार्थ/आदेशार्थ प्रस्तुत
33 31 Aug 2022 Narendra Pant In-Process @Basant Lal(010022168) ji, Application has been forwarded to you, kindly do the needfull. comments : वरिष्ठ प्रशासनिक अधिकारी, महोदय ठेकेदार द्वारा अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है। अतः अवलोकनार्थ/आदेशार्थ प्रस्तुत
34 31 Aug 2022 Narendra Pant In-Process work thalisain mai gadoli gungari motor road work has been approved by Narendra Pant
35 31 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work
36 31 Aug 2022 Narendra Pant In-Process work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road has been approved by Narendra Pant
37 31 Aug 2022 Narendra Pant In-Process work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road has been approved by Narendra Pant
38 26 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work under annual maintenance 2022 patch repair work in total 9 km of karnprayag nauti paithani motor road
39 26 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under district plan the work of moutain cutting in km 02 under the new construction of seyoli malli to tila motor road
40 26 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work
41 08 Aug 2022 Yogamber Singh Rawat Comments Application Forwarded to Niyojan 3 Team.
42 08 Aug 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
43 26 Jul 2022 Kunwar Singh Aswal Reverted Experience certificate of work at S.No. 3 also includes bridge. After removing this component work experience becomes less than required amount. So, this experience certificate is not acceptable.
44 24 Jul 2022 Ashok Kumar In-Process Experience certificate of work at S.No. 3 also includes bridge. After removing this component work experience becomes less than required amount. So, this experience certificate is not acceptable.
45 14 Jul 2022 Kunwar Singh Aswal In-Process ALTHOUGH VERIFIED EXPERIENCE CERTIFICATES NO 1,2,5 ARE UPLOADED IMPROPERLY BUT ALL REQUIRED DOCUMENTS ARE AVAILABLE HENCE RECOMMENDED FOR APPROVAL OF REGISTRATION.
46 08 Jul 2022 Manoj Kumar Bisht In-Process work verification done successfully Registration may be done .
47 07 Jul 2022 Basant Lal In-Process work thalisain mai gadoli gungari motor road work has been approved by Basant Lal
48 07 Jul 2022 Basant Lal In-Process work Thalisain Gadoli Gugri Moter Marg has been approved by Basant Lal
49 07 Jul 2022 Basant Lal In-Process work Thalisain has been approved by Basant Lal
50 07 Jul 2022 Basant Lal In-Process work Srinagar To jakh To Agroda Mote Road has been approved by Basant Lal
51 07 Jul 2022 Basant Lal In-Process work Karnparyag Nauti Motar Marg has been approved by Basant Lal
52 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Thalisain
53 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Thalisain Gadoli Gugri Moter Marg
54 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work thalisain mai gadoli gungari motor road work
55 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Srinagar To jakh To Agroda Mote Road
56 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Karnparyag Nauti Motar Marg
57 01 Jul 2022 Manoj Kumar Bisht Comments do verification
58 30 Jun 2022 Narendra Pant Comments महोदय कृपया फर्म/ठेकेदार द्वारा एस0ओ0पी0 के अनुसार सभी अभिलेख अपलोड किये गये है अतः आदेश हो तो सम्बन्धित अभिलेख सत्यापन हेतु भेजे जा सकते है। कृपया आदेशार्थ प्रस्तुत।
59 30 Jun 2022 Yogamber Singh Rawat Comments Application Forwarded to Niyojan 3 Team.
60 30 Jun 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
61 25 Jun 2022 Kunwar Singh Aswal Reverted PLEASE UPLOAD DEGREE OF MR.VIVEK KUMAR INSTEAD OF PROVISIONAL CERTIFICATE.
62 23 Jun 2022 Narendra Pant Comments वरिष्ठ प्रशासनिक अधिकारी महोदय कृपया उक्त सम्बन्ध में अवगत कराना है कि एस0ओ0पी0 के अनुसार फर्म/ठेकेदार द्वारा अपलोड प्रपत्रों का परीक्षण किया गया है, जिनकी स्थिति निम्नानुसार हैः- 1. एस0ओ0पी0 के क्रमांक 4 के अनुसार फर्म/ठेकेदार द्वारा फोटो अपलोड की गयी है। 2. एस0ओ0पी0 के क्रमांक 5 के अनुसार चरित्र प्रमाण पत्र की प्रति अपलोड की गयी है। 3. एस0ओ0पी0 के क्रमांक 6 के अनुसार हैसियत प्रमाण पत्र उपजिलाधिकरी चाकीसैण जिला पौडी के पत्र दिनांक 22.04.2022 द्वारा जारी रू0 58,186.49 लाख की हैसियत प्रमाण पत्र प्रति अपलोड की गयी है। 4. एस0ओ0पी0 के क्रमांक 7 अनुसार फर्म/ठेकेदार द्वारा जी0एस0टी0 प्रमाण पत्र की प्रति अपलोड की गयी है। 6. एस0ओ0पी0 के क्रमांक 9 के अनुसार फर्म/ठेकेदार द्वारा मशीनरी की सूची दी गयी है। 7. एस0ओ0पी0 के क्रमांक 10 के अनुसार फर्म/ठेकेदार द्वारा तकनीकी स्टॉफ के शैक्षिक प्रमाण पत्र अपलोड किये गये है। (तकनीकी स्टाफ में कार्यरत श्री विजय कुमार का प्रोविजन सर्टिफिकेट की प्रति अपलोड की गयी है।) 8. एस0ओ0पी0 के क्रमांक 11 के अनुसार फर्म/ठेकेदार द्वारा अनुभव प्रमाण पत्र की प्रति अपलोड किये गये है। 9. एस0ओ0पी0 के क्रमांक 12 के अनुसार फर्म/ठेकेदार द्वारा जमानती धनराशि रू0 1.00 (रू0 एक लाख) मात्र का पूर्व में इस कार्यालय में जमा है। जिसका पुनः सम्बन्धित बैंक से सत्यापन किया जाना है। 10. एस0ओ0पी0 के क्रमांक 13 के अनुसार फर्म/ठेकेदार द्वारा वर्ष 2021-22 की आई0टी0आर0 की प्रति अपलोड की गयी है। अतः उपरोक्तानुसार अवलोकनार्थ/आदेशार्थ प्रस्तुत।
63 20 Jun 2022 Yogamber Singh Rawat Comments Application Forwarded to Niyojan 3 Team.
64 20 Jun 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
65 18 Jun 2022 Yogamber Singh Rawat Reverted document not submitted.
66 18 Jun 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.