Dashboard Contractor Registration

Contractor Application No. 43444 for Category Road Class A Applied Office : E-n-C Office Applied On Date : 14 Aug 2022

09 Sep 2022

Status : Registration Granted

By: Ashok Kumar

Approved provisionally

07 Sep 2022

Status : In-Process

By: Kunwar Singh Aswal

@Ashok Kumar(42270213M00002) ji, Application has been forwarded to you, kindly do the needfull. comments : RECOMMENDED FOR REGISTRATION IN ROAD CLASS A.

05 Sep 2022

Status : In-Process

By: Narendra Pant

work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05. has been approved by Narendra Pant

05 Sep 2022

Status : In-Process

By: Narendra Pant

work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district. has been approved by Narendra Pant

05 Sep 2022

Status : In-Process

By: Narendra Pant

work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon.. has been approved by Narendra Pant

05 Sep 2022

Status : In-Process

By: Narendra Pant

work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance. has been approved by Narendra Pant

26 Aug 2022

Status : In-Process

By: Narendra Pant

work Under the state plan, the work of construction of mountain road from Ekeshwar Masi to Masi Inter College in Chaubattakhal, assembly constituency of Pauri Garhwal district, under construction work of Pahat Katan Scaper, km 0 01 (Chav 1000 to 1.575) has been approved by Narendra Pant

20 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05.

20 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the state plan, the work of construction of mountain road from Ekeshwar Masi to Masi Inter College in Chaubattakhal, assembly constituency of Pauri Garhwal district, under construction work of Pahat Katan Scaper, km 0 01 (Chav 1000 to 1.575)

20 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon..

20 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district.

20 Aug 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance.

16 Aug 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 3 Team.

16 Aug 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

12 Aug 2022

Status : Reverted

By: Kunwar Singh Aswal

EXPERIENCE CERTIFICATE NO 5 CAN NOT BE CONSIDERED FOR ROAD WORK EXPERIENCE.

05 Jul 2022

Status : Acknowledged

By: Manoj Kumar Bisht

@Aswal sir , 8 m culvert may be treated as part of road work . Items in culvert matches with scupper / culvert /wall of road work. You may like to review this for confirmation to consider this as work experience.

05 Jul 2022

Status : Acknowledged

By: Manoj Kumar Bisht

@Aswal sir , 8 m culvert may be treated as part of road work . Items in culvert matches with scupper / culvert /wall of road work. You may like to review this for confirmation to consider this as work experience.

05 Jul 2022

Status : Acknowledged

By: Narendra Pant

महोदय फर्म/ठेकेदार द्वारा 05 अनुभव प्रमाण पत्र की प्रति अपलोड किये गये है। जिसमें 01 अनुबन्ध सं0 110 ई0ई0 दिनांक 21.12.2019 लागत रू0 14.88 लाख का कार्य पुलिया के निर्माण से सम्बन्धित है। अतः आदेशार्थ/ आवलोकनार्थ प्रस्तुत।

04 Jul 2022

Status : In-Process

By: Narendra Pant

work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05. has been approved by Narendra Pant

04 Jul 2022

Status : In-Process

By: Narendra Pant

work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district. has been approved by Narendra Pant

04 Jul 2022

Status : In-Process

By: Narendra Pant

work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon.. has been approved by Narendra Pant

04 Jul 2022

Status : In-Process

By: Narendra Pant

work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance. has been approved by Narendra Pant

02 Jul 2022

Status : Acknowledged

By: Manoj Kumar Bisht

complete verification process.

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the state plan for the new construction work of motor road from Chaura to Bengali under Thalisain block of Srinagar, Pauri Garhwal assembly constituency under the construction work of 8 mtr. span culvert in 01hectare, km.8_10

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05.

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district.

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon..

02 Jul 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance.

27 Jun 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the state plan for the new construction work of motor road from Chaura to Bengali under Thalisain block of Srinagar, Pauri Garhwal assembly constituency under the construction work of 8 mtr. span culvert in 01hectare, km.8_10

27 Jun 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05.

27 Jun 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district.

27 Jun 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon..

27 Jun 2022

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance.

27 Jun 2022

Status : Comments

By: Kunwar Singh Aswal

S.A.O/H.A- ALL REQUIRED DOCUMENTS ARE UPLOADED HENCE SEND THEM FOR VERIFICATION.

22 Jun 2022

Status : Comments

By: Yogamber Singh Rawat

S.S.O. Sir कृप्या आदेर्शाथ।

22 Jun 2022

Status : Comments

By: Basant Lal

उपरोक्तानुसार अवलोकनार्थ/आदेशार्थ प्रस्तुत।

22 Jun 2022

Status : Comments

By: Narendra Pant

वरिष्ट प्रशासनिक अधिकरी महोदय, कृपया उक्त सम्बन्ध में अवगत कराना है कि फर्म/ठेकेदार द्वारा एस0ओ0पी0 के अनुसार अपलोड प्रपत्रों का परीक्षण किया गया है, जिनकी स्थिति निम्नानुसार हैः- 1 एस0ओ0पी0 के क्रमांक 4 के अनुसार फर्म/ठेकेदार द्वारा फोटो अपलोड की गयी है। 2. एस0ओ0पी0 के क्रमांक 5 के अनुसार चरित्र प्रमाण पत्र की प्रति अपलोड की गयी है। 3. एस0ओ0पी0 के क्रमांक 6 के अनुसार हैसियत प्रमाण पत्र के स्थान पर नैनीताल बैंक राजेश्वरी पुराम जोगीवाल देहरादून के पत्र दिनांक 16.06.2022 रू0 90.00 लाख की बैक सॉल्वेंसी सर्टिफिकेट की प्रति अपलोड की गयी है। 4. एस0ओ0पी0 के क्रमांक 7 के अनुसार फर्म/ठेकेदार द्वारा आयकर प्रमाण पत्र, पैन कार्ड की प्रति अपलोड की गयी। 5. एस0ओ0पी0 के क्रमांक 8 के अनुसार फर्म/ठेकेदार द्वारा जी0एस0टी0 प्रमाण पत्र की प्रति अपलोड की गयी है। 6. एस0ओ0पी0 के क्रमांक 9 के अनुसार फर्म/ठेकेदार द्वारा मशीनरी की सूची दी गयी है। 7. एस0ओ0पी0 के क्रमांक 10. के अनुसार फर्म/ठेकेदार द्वारा तकनीकी स्टॉफ के शैक्षिक प्रमाण पत्र, पैन कार्ड की प्रति अपलोड की गयी है लेकिन तकनीकी स्टॉफ की फोटो अपलोड नही की गयी है। 8. एस0ओ0पी0 के क्रमांक 11 के अनुसार फर्म/ठेकेदार द्वारा 05 अनुभव प्रमाण पत्र की प्रति अपलोड किये गये है, जिसमें 01 (अनुबन्ध सं0 110/ई0ई0 दिनांक 21.22.2019 लागत रू0 14.88 लाख) कार्य पुलिया से सम्बन्धित है। 9. एस0ओ0पी0 के क्रमांक 12 के अनुसार फर्म/ठेकेदार द्वारा जमानती धनराशि रू0 1.00 (रू0 एक लाख) मात्र का पूर्व में इस कार्यालय में जमा है। जिसका पुनः सम्बन्धित बैंक से सत्यापन किया जाना है। 10. एस0ओ0पी0 के क्रमांक 13 के अनुसार फर्म/ठेकेदार द्वारा वर्ष 2021-22 की आई0टीआर0 की प्रति अपलोड की गयी है। अतः उपरोक्तानुसार अवलोकनार्थ/आदेशार्थ प्रस्तुत।

18 Jun 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 3 Team.

18 Jun 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 09 Sep 2022 Ashok Kumar Registration Granted Approved provisionally
2 07 Sep 2022 Kunwar Singh Aswal In-Process @Ashok Kumar(42270213M00002) ji, Application has been forwarded to you, kindly do the needfull. comments : RECOMMENDED FOR REGISTRATION IN ROAD CLASS A.
3 05 Sep 2022 Narendra Pant In-Process work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05. has been approved by Narendra Pant
4 05 Sep 2022 Narendra Pant In-Process work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district. has been approved by Narendra Pant
5 05 Sep 2022 Narendra Pant In-Process work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon.. has been approved by Narendra Pant
6 05 Sep 2022 Narendra Pant In-Process work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance. has been approved by Narendra Pant
7 26 Aug 2022 Narendra Pant In-Process work Under the state plan, the work of construction of mountain road from Ekeshwar Masi to Masi Inter College in Chaubattakhal, assembly constituency of Pauri Garhwal district, under construction work of Pahat Katan Scaper, km 0 01 (Chav 1000 to 1.575) has been approved by Narendra Pant
8 20 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05.
9 20 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the state plan, the work of construction of mountain road from Ekeshwar Masi to Masi Inter College in Chaubattakhal, assembly constituency of Pauri Garhwal district, under construction work of Pahat Katan Scaper, km 0 01 (Chav 1000 to 1.575)
10 20 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon..
11 20 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district.
12 20 Aug 2022 Narendra Pant In-Process Mail Has been send for Verification of work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance.
13 16 Aug 2022 Yogamber Singh Rawat Comments Application Forwarded to Niyojan 3 Team.
14 16 Aug 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
15 12 Aug 2022 Kunwar Singh Aswal Reverted EXPERIENCE CERTIFICATE NO 5 CAN NOT BE CONSIDERED FOR ROAD WORK EXPERIENCE.
16 05 Jul 2022 Manoj Kumar Bisht Acknowledged @Aswal sir , 8 m culvert may be treated as part of road work . Items in culvert matches with scupper / culvert /wall of road work. You may like to review this for confirmation to consider this as work experience.
17 05 Jul 2022 Manoj Kumar Bisht Acknowledged @Aswal sir , 8 m culvert may be treated as part of road work . Items in culvert matches with scupper / culvert /wall of road work. You may like to review this for confirmation to consider this as work experience.
18 05 Jul 2022 Narendra Pant Acknowledged महोदय फर्म/ठेकेदार द्वारा 05 अनुभव प्रमाण पत्र की प्रति अपलोड किये गये है। जिसमें 01 अनुबन्ध सं0 110 ई0ई0 दिनांक 21.12.2019 लागत रू0 14.88 लाख का कार्य पुलिया के निर्माण से सम्बन्धित है। अतः आदेशार्थ/ आवलोकनार्थ प्रस्तुत।
19 04 Jul 2022 Narendra Pant In-Process work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05. has been approved by Narendra Pant
20 04 Jul 2022 Narendra Pant In-Process work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district. has been approved by Narendra Pant
21 04 Jul 2022 Narendra Pant In-Process work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon.. has been approved by Narendra Pant
22 04 Jul 2022 Narendra Pant In-Process work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance. has been approved by Narendra Pant
23 02 Jul 2022 Manoj Kumar Bisht Acknowledged complete verification process.
24 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the state plan for the new construction work of motor road from Chaura to Bengali under Thalisain block of Srinagar, Pauri Garhwal assembly constituency under the construction work of 8 mtr. span culvert in 01hectare, km.8_10
25 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05.
26 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district.
27 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon..
28 02 Jul 2022 Narendra Pant In-Process Mail Has been send for Verification of work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance.
29 27 Jun 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the state plan for the new construction work of motor road from Chaura to Bengali under Thalisain block of Srinagar, Pauri Garhwal assembly constituency under the construction work of 8 mtr. span culvert in 01hectare, km.8_10
30 27 Jun 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under The State Plan, the new construction work of Majra mahadev to Katud motor road under the assembly constituency Srinagar of Pauri Garhwal district, the work of construction of raw drain and defect cutting in km. 01 to 05.
31 27 Jun 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the State Plan the work of asphaltization by the remaining G_1, G_2, G_3 and P.C, under the asphaltization work of the motor road from Rikholi band to Gadoli in the Thalisain block of Pauri garhwal district.
32 27 Jun 2022 Narendra Pant In-Process Mail Has been send for Verification of work Under the District plan year_2016_17 construction work of motor road from NH_121 to Sunargaon..
33 27 Jun 2022 Narendra Pant In-Process Mail Has been send for Verification of work Renovation work by P.C. in km. 01 to 05 total 05km. of Changeen Kucholi Kathud motor way under annual maintenance.
34 27 Jun 2022 Kunwar Singh Aswal Comments S.A.O/H.A- ALL REQUIRED DOCUMENTS ARE UPLOADED HENCE SEND THEM FOR VERIFICATION.
35 22 Jun 2022 Yogamber Singh Rawat Comments S.S.O. Sir कृप्या आदेर्शाथ।
36 22 Jun 2022 Basant Lal Comments उपरोक्तानुसार अवलोकनार्थ/आदेशार्थ प्रस्तुत।
37 22 Jun 2022 Narendra Pant Comments वरिष्ट प्रशासनिक अधिकरी महोदय, कृपया उक्त सम्बन्ध में अवगत कराना है कि फर्म/ठेकेदार द्वारा एस0ओ0पी0 के अनुसार अपलोड प्रपत्रों का परीक्षण किया गया है, जिनकी स्थिति निम्नानुसार हैः- 1 एस0ओ0पी0 के क्रमांक 4 के अनुसार फर्म/ठेकेदार द्वारा फोटो अपलोड की गयी है। 2. एस0ओ0पी0 के क्रमांक 5 के अनुसार चरित्र प्रमाण पत्र की प्रति अपलोड की गयी है। 3. एस0ओ0पी0 के क्रमांक 6 के अनुसार हैसियत प्रमाण पत्र के स्थान पर नैनीताल बैंक राजेश्वरी पुराम जोगीवाल देहरादून के पत्र दिनांक 16.06.2022 रू0 90.00 लाख की बैक सॉल्वेंसी सर्टिफिकेट की प्रति अपलोड की गयी है। 4. एस0ओ0पी0 के क्रमांक 7 के अनुसार फर्म/ठेकेदार द्वारा आयकर प्रमाण पत्र, पैन कार्ड की प्रति अपलोड की गयी। 5. एस0ओ0पी0 के क्रमांक 8 के अनुसार फर्म/ठेकेदार द्वारा जी0एस0टी0 प्रमाण पत्र की प्रति अपलोड की गयी है। 6. एस0ओ0पी0 के क्रमांक 9 के अनुसार फर्म/ठेकेदार द्वारा मशीनरी की सूची दी गयी है। 7. एस0ओ0पी0 के क्रमांक 10. के अनुसार फर्म/ठेकेदार द्वारा तकनीकी स्टॉफ के शैक्षिक प्रमाण पत्र, पैन कार्ड की प्रति अपलोड की गयी है लेकिन तकनीकी स्टॉफ की फोटो अपलोड नही की गयी है। 8. एस0ओ0पी0 के क्रमांक 11 के अनुसार फर्म/ठेकेदार द्वारा 05 अनुभव प्रमाण पत्र की प्रति अपलोड किये गये है, जिसमें 01 (अनुबन्ध सं0 110/ई0ई0 दिनांक 21.22.2019 लागत रू0 14.88 लाख) कार्य पुलिया से सम्बन्धित है। 9. एस0ओ0पी0 के क्रमांक 12 के अनुसार फर्म/ठेकेदार द्वारा जमानती धनराशि रू0 1.00 (रू0 एक लाख) मात्र का पूर्व में इस कार्यालय में जमा है। जिसका पुनः सम्बन्धित बैंक से सत्यापन किया जाना है। 10. एस0ओ0पी0 के क्रमांक 13 के अनुसार फर्म/ठेकेदार द्वारा वर्ष 2021-22 की आई0टीआर0 की प्रति अपलोड की गयी है। अतः उपरोक्तानुसार अवलोकनार्थ/आदेशार्थ प्रस्तुत।
38 18 Jun 2022 Yogamber Singh Rawat Comments Application Forwarded to Niyojan 3 Team.
39 18 Jun 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.