1 |
06 Mar 2024
|
Ramesh Chand Joshi
|
Registration Granted
|
FDR has been re-Uploaded for Application
|
2 |
02 Mar 2024
|
Ramesh Chand Joshi
|
In-Process
|
@Om Prakash(010099553) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय कृपया ठेकेदार द्वारा प्रस्तुत एफ0डी0आर0 खाता संख्या 50300933419925 दिनाॅक 28.02.2024 रु0 1.00 लाख का सत्यापन एच0डी0एफ0सी0 बैंक, शाखा-नेहरू कालोनी, देहरादून से आॅफ लाईन के माध्यम से करा लिया गया है। कृपया ठेकेदार का प्रोविजनल पंजीकरण का विस्तार किया जा सकता है।
|
3 |
01 Mar 2024
|
Om Prakash
|
Registration Granted
|
Approved as per comment of officer.
|
4 |
20 Feb 2024
|
Manoj Kumar Bisht
|
In-Process
|
@Om Prakash(010099553) ji, Application has been forwarded to you, kindly do the needfull. comments : Registration may be granted
|
5 |
20 Feb 2024
|
Vishal Sharma
|
In-Process
|
@Manoj Kumar Bisht(010096004) ji, Application has been forwarded to you, kindly do the needfull. comments : sir,
docs submitted by applicant have been verified by section. hence registration may be granted as per details ..
|
6 |
19 Feb 2024
|
Ramesh Chand Joshi
|
In-Process
|
@Vishal Sharma(0700701) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय,
कृपया ठेकेदार द्वारा प्रस्तुत अभिलेख चरित्र /हैसियत /बैंक सौल्वेन्सी /अनुभव प्रमाण पत्रों का आॅफ /आॅन लाईन सत्यापन प्राप्त हो चुका है। कृपया सम्बन्धित ठेकेदार का मार्ग कार्यो हेतु श्रेणी ए में पंजीकरण किये जाने पर विचार करना चाहें
|
7 |
19 Feb 2024
|
Soban Singh
|
In-Process
|
@Ramesh Chand Joshi(010086713) ji, Application has been forwarded to you, kindly do the needfull. comments : कृपया ठेकेदार द्वारा प्रस्तुत अभिलेख चरित्र/हैसियत/बैंक सौल्वेन्सी/अनुभव प्रमाण पत्रों का आॅफ /आॅन लाईन सत्यापन प्राप्त हो चुका है। कृपया सम्बन्धित ठेकेदार का मार्ग कार्यो हेतु श्रेणी ए में पंजीकरण किय जाने पर विचार करना चाहें
|
8 |
19 Feb 2024
|
Soban Singh
|
In-Process
|
work Repair and maintenance of the stretch of NH_709A pkg._II from Shamli to Haryana Border section of Meerut_Budhana_Shamli_Haryana Border in the State of Uttar Pradesh. has been approved by Soban Singh
|
9 |
19 Feb 2024
|
Soban Singh
|
In-Process
|
work Providing and laying of bituminous overlay, construction of drain and providing and erection iron grill as per specification at elevated as well as at grade portion of Badarpur Elevated Highway in Faridabad and Delhi in the State of Haryana & Delhi. has been approved by Soban Singh
|
10 |
19 Feb 2024
|
Soban Singh
|
In-Process
|
work Resurfacing of 60m wide peripheral road and 54 m wide internal wide road of sector Ecotech_VII, Greater Noida. has been approved by Soban Singh
|
11 |
19 Feb 2024
|
Soban Singh
|
In-Process
|
work Resurfacing of servicr road along 130m wide road from Hindon Bridge to Ecotech_12 Rotary, Greater Noida. has been approved by Soban Singh
|
12 |
19 Feb 2024
|
Soban Singh
|
In-Process
|
work Construction of Two underpasses at IMA Dehradun (SPL WK) under deposit work. has been approved by Soban Singh
|
13 |
05 Feb 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Construction of Two underpasses at IMA Dehradun (SPL WK) under deposit work.
|
14 |
05 Feb 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Providing and laying of bituminous overlay, construction of drain and providing and erection iron grill as per specification at elevated as well as at grade portion of Badarpur Elevated Highway in Faridabad and Delhi in the State of Haryana & Delhi.
|
15 |
05 Feb 2024
|
Ramesh Chand Joshi
|
In-Process
|
work Providing and laying of bituminous overlay, construction of drain and providing and erection iron grill as per specification at elevated as well as at grade portion of Badarpur Elevated Highway in Faridabad and Delhi in the State of Haryana & Delhi. has been dis-approved by Ramesh Chand Joshi
|
16 |
05 Feb 2024
|
Ramesh Chand Joshi
|
In-Process
|
work Construction of Two underpasses at IMA Dehradun (SPL WK) under deposit work. has been dis-approved by Ramesh Chand Joshi
|
17 |
05 Feb 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Construction of Two underpasses at IMA Dehradun (SPL WK) under deposit work.
|
18 |
05 Feb 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Construction of Two underpasses at IMA Dehradun (SPL WK) under deposit work.
|
19 |
01 Feb 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Repair and maintenance of the stretch of NH_709A pkg._II from Shamli to Haryana Border section of Meerut_Budhana_Shamli_Haryana Border in the State of Uttar Pradesh.
|
20 |
31 Jan 2024
|
Ramesh Chand Joshi
|
In-Process
|
work Repair and maintenance of the stretch of NH_709A pkg._II from Shamli to Haryana Border section of Meerut_Budhana_Shamli_Haryana Border in the State of Uttar Pradesh. has been dis-approved by Ramesh Chand Joshi
|
21 |
30 Jan 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Resurfacing of 60m wide peripheral road and 54 m wide internal wide road of sector Ecotech_VII, Greater Noida.
|
22 |
30 Jan 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Resurfacing of servicr road along 130m wide road from Hindon Bridge to Ecotech_12 Rotary, Greater Noida.
|
23 |
20 Jan 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Providing and laying of bituminous overlay, construction of drain and providing and erection iron grill as per specification at elevated as well as at grade portion of Badarpur Elevated Highway in Faridabad and Delhi in the State of Haryana & Delhi.
|
24 |
20 Jan 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Resurfacing of 60m wide peripheral road and 54 m wide internal wide road of sector Ecotech_VII, Greater Noida.
|
25 |
20 Jan 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Resurfacing of servicr road along 130m wide road from Hindon Bridge to Ecotech_12 Rotary, Greater Noida.
|
26 |
20 Jan 2024
|
Ramesh Chand Joshi
|
In-Process
|
Mail Has been send for Verification of work Construction of Two underpasses at IMA Dehradun (SPL WK) under deposit work.
|
27 |
18 Jan 2024
|
Yogamber Singh Rawat
|
Acknowledged
|
Application Forwarded to Vidhi Team.
|
28 |
18 Jan 2024
|
Yogamber Singh Rawat
|
Acknowledged
|
Application Acknoledged.
|
29 |
09 Jan 2024
|
Soban Singh
|
Reverted
|
कृपया आपके द्वारा किये गये अनुरोध पर प्रकरण वापस लौटाया जा रहा है।
|
30 |
27 Dec 2023
|
Soban Singh
|
In-Process
|
Mail Has been send for Verification of work Resurfacing of 60m wide peripheral road and 54 m wide internal wide road of sector Ecotech_VII, Greater Noida.
|
31 |
27 Dec 2023
|
Soban Singh
|
In-Process
|
Mail Has been send for Verification of work Providing and laying of bituminous overlay, construction of drain and providing and erection iron grill as per specification at elevated as well as at grade portion of Badarpur Elevated Highway in Faridabad and Delhi in the State of Haryana & Delhi.
|
32 |
27 Dec 2023
|
Soban Singh
|
In-Process
|
Mail Has been send for Verification of work Repair and maintenance of the stretch of NH_709A pkg._II from Shamli to Haryana Border section of Meerut_Budhana_Shamli_Haryana Border in the State of Uttar Pradesh.
|
33 |
27 Dec 2023
|
Soban Singh
|
In-Process
|
Mail Has been send for Verification of work Resurfacing of servicr road along 130m wide road from Hindon Bridge to Ecotech_12 Rotary, Greater Noida.
|
34 |
27 Dec 2023
|
Soban Singh
|
In-Process
|
Mail Has been send for Verification of work Construction of Two underpasses at IMA Dehradun (SPL WK) under deposit work.
|
35 |
23 Dec 2023
|
Prem Lata Bisht
|
Comments
|
Application Forwarded to Vidhi Team.
|
36 |
23 Dec 2023
|
Prem Lata Bisht
|
Acknowledged
|
Application Acknoledged.
|
37 |
18 Dec 2023
|
Ramesh Chand Joshi
|
Reverted
|
महोदय, कृपया अवगत कराना है कि आपके द्वारा पंजीकरण किये जाने हेतु जो अभिलेख अपलोड किये गये है उनका इस कार्यालय द्वारा परीक्षण किया गया जिसमें निम्न कमियां पाई गईः-
1.क्रमांक 04 पर जो अनुभव प्रमाण पत्र अपलोड किया गया है वह कार्यपूर्ण होने का नहीं है तथा न ही अनुभव प्रमाण पत्र में कार्य सन्तोषजनक होने का उल्लेख किया गया है।
2. क्रमांक 05 पर जो अनुभव प्रमाण पत्र अपलोड किया गया है वह कार्यपूर्ण होने का नहीं है।
3. आपके द्वारा पाॅवर आफ अर्टोनी का शपथ पत्र अपलोड नहीं किया गया है।
अतः उपरोक्त कमियो का निराकरण करने का कष्ट करे ताकि प्रकरण पर अग्रिम आवश्यक कार्यवाही की जा सकें।
|
38 |
18 Dec 2023
|
Prem Lata Bisht
|
Comments
|
Application Forwarded to Vidhi Team.
|
39 |
18 Dec 2023
|
Prem Lata Bisht
|
Acknowledged
|
Application Acknoledged.
|