Contractor Application No. 85697 for Category Building Class A Applied Office : E-n-C Office Applied On Date : 08 Apr 2024

25 Apr 2024

Status : Registration Granted

By: Om Prakash

Approved as per comments of officer and the verification done by the section.

25 Apr 2024

Status : In-Process

By: Jeewan Singh Hyanki

@Om Prakash(010099553) ji, Application has been forwarded to you, kindly do the needfull. comments : विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Building कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत

24 Apr 2024

Status : In-Process

By: Vinod Kumar

@Jeewan Singh Hyanki(010099561) ji, Application has been forwarded to you, kindly do the needfull. comments : SSO Sir, सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Building कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत

22 Apr 2024

Status : In-Process

By: Kedar Singh

@Vinod Kumar(570064276) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Sir, सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Building कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत

16 Apr 2024

Status : In-Process

By: Yogamber Singh Rawat

Application Forwarded to Parkeen Team.

16 Apr 2024

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

08 Apr 2024

Status : Reverted

By: Kedar Singh

Hasiyat Amount Mismatch

02 Apr 2024

Status : In-Process

By: Kedar Singh

work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department has been approved by Kedar Singh

02 Apr 2024

Status : In-Process

By: Kedar Singh

work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District. has been approved by Kedar Singh

02 Apr 2024

Status : In-Process

By: Kedar Singh

work Construction work of additional room in old Bijapur Campus in Dehradun District. has been approved by Kedar Singh

02 Apr 2024

Status : In-Process

By: Kedar Singh

work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House. has been approved by Kedar Singh

02 Apr 2024

Status : In-Process

By: Kedar Singh

work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House. has been approved by Kedar Singh

01 Apr 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department

01 Apr 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District.

01 Apr 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of additional room in old Bijapur Campus in Dehradun District.

01 Apr 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House.

01 Apr 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House.

21 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department

21 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District.

21 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of additional room in old Bijapur Campus in Dehradun District.

21 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House.

21 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House.

11 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department

11 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District.

11 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of additional room in old Bijapur Campus in Dehradun District.

11 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House.

11 Mar 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House.

13 Feb 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department

13 Feb 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District.

13 Feb 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Construction work of additional room in old Bijapur Campus in Dehradun District.

13 Feb 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House.

13 Feb 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House.

09 Feb 2024

Status : Comments

By: Manoj Barthwal

Application Forwarded to Parkeen Team.

09 Feb 2024

Status : Acknowledged

By: Manoj Barthwal

Application Acknoledged.

20 Jan 2024

Status : Reverted

By: Kedar Singh

Letter No. and date of experience certificate in Sl. No. 5 is not mentioned. Experience certificates mentioned from s.no. 1 to 5 are not in the prescribed format. Salary slip of technical staff is not uploaded.

11 Jan 2024

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Parkeen Team.

11 Jan 2024

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

09 Jan 2024

Status : Reverted

By: Kedar Singh

Character certificate has expired. 2. Solvency certificate has expired. 3.Experience certificates mentioned from s.no. 1 to 5 are not in the prescribed format. 4. Degree certificate of Mr. Rajendra kumar has not been submitted. 5. Pay slip of engineers has not been submitted.

09 Jan 2024

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work SPRM YOJNA RANI POKHRI HAT BAZAR PUNARDWAR EVAM CENTRE NIRMAN

18 Dec 2023

Status : Reverted

By: Kedar Singh

1. Character certificate has expired. 2. Solvency certificate has expired. 3.Experience certificates mentioned from s.no. 1 to 5 are not in the prescribed format. 4. Degree certificate of Mr. Rajendra kumar has not been submitted. 5. Pay slip of engineers has not been submitted.

12 Dec 2023

Status : Submitted

By: Rachana Thapliyal

@Anand Singh Manral(010091895) ji, Application has been forwarded to you, kindly do the needfull. comments : Please inform the applicant of the following issues in his application: 1. Character certificate has expired. 2. Solvency certificate has expired. 3.Experience certificates mentioned from s.no. 1 to 5 are not in the prescribed format. 4. Degree certificate of Mr. Rajendra kumar has not been submitted. 5. Pay slip of engineers has not been submitted.

06 Dec 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work DISTRICT DEHRADUN OLD BIJAPUR CONSTRUCTION OF EXTRA ROOMS

06 Dec 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work RENOVATION OF SPECIALITY PRODUCT LAB

06 Dec 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work BIJAPUR GUEST HOUSE CM SECURITY, OSD, SACHIV ROOM, TOILET ETC.

06 Dec 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work POLICE BAL ADHUNIKIKARAN YOJNA YEAR 2013_14 FOR I E D MODLE ROOM

06 Dec 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work BIJAPUR GUEST HOUSE EXTRA ROOMS, FANCING, WATERPROOFING AND SEVER LINE SHIFTING

06 Dec 2023

Status : In-Process

By: Kedar Singh

Mail Has been send for Verification of work SPRM YOJNA RANI POKHRI HAT BAZAR PUNARDWAR EVAM CENTRE NIRMAN

22 Nov 2023

Status : Comments

By: Kedar Singh

@Rachana Thapliyal(360019156) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Ma'am, 1. Affidavit of technical staff from the contractor or affidavit from technical staff is not uploaded. 2. Technical staff Shri Rejendra kumar degree is not uploaded. 3. BOQ of experience certificate is not uploaded by the contractor.

09 Nov 2023

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Parkeen Team.

09 Nov 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 25 Apr 2024 Om Prakash Registration Granted Approved as per comments of officer and the verification done by the section.
2 25 Apr 2024 Jeewan Singh Hyanki In-Process @Om Prakash(010099553) ji, Application has been forwarded to you, kindly do the needfull. comments : विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Building कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत
3 24 Apr 2024 Vinod Kumar In-Process @Jeewan Singh Hyanki(010099561) ji, Application has been forwarded to you, kindly do the needfull. comments : SSO Sir, सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Building कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत
4 22 Apr 2024 Kedar Singh In-Process @Vinod Kumar(570064276) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Sir, सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Building कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत
5 16 Apr 2024 Yogamber Singh Rawat In-Process Application Forwarded to Parkeen Team.
6 16 Apr 2024 Yogamber Singh Rawat Acknowledged Application Acknoledged.
7 08 Apr 2024 Kedar Singh Reverted Hasiyat Amount Mismatch
8 02 Apr 2024 Kedar Singh In-Process work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department has been approved by Kedar Singh
9 02 Apr 2024 Kedar Singh In-Process work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District. has been approved by Kedar Singh
10 02 Apr 2024 Kedar Singh In-Process work Construction work of additional room in old Bijapur Campus in Dehradun District. has been approved by Kedar Singh
11 02 Apr 2024 Kedar Singh In-Process work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House. has been approved by Kedar Singh
12 02 Apr 2024 Kedar Singh In-Process work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House. has been approved by Kedar Singh
13 01 Apr 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department
14 01 Apr 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District.
15 01 Apr 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of additional room in old Bijapur Campus in Dehradun District.
16 01 Apr 2024 Kedar Singh In-Process Mail Has been send for Verification of work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House.
17 01 Apr 2024 Kedar Singh In-Process Mail Has been send for Verification of work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House.
18 21 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department
19 21 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District.
20 21 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of additional room in old Bijapur Campus in Dehradun District.
21 21 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House.
22 21 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House.
23 11 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department
24 11 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District.
25 11 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of additional room in old Bijapur Campus in Dehradun District.
26 11 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House.
27 11 Mar 2024 Kedar Singh In-Process Mail Has been send for Verification of work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House.
28 13 Feb 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of Monsoon Hut in the lawn located in front of the main building in the premises of the residence of the Honorable Chief Minister located at New Cantt Road in Dehradun district under the control of State property Department
29 13 Feb 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction of model room for I.E.D. training under Police force modernization scheme 2013_14 in Dehradun District.
30 13 Feb 2024 Kedar Singh In-Process Mail Has been send for Verification of work Construction work of additional room in old Bijapur Campus in Dehradun District.
31 13 Feb 2024 Kedar Singh In-Process Mail Has been send for Verification of work Work of room and toilet of the Honorable Chief Minister Security, OSD and Secretary at Bijapur Guest House.
32 13 Feb 2024 Kedar Singh In-Process Mail Has been send for Verification of work Under Annual Maintenance, work of additional room fencing waterproof and civil line shifting in Bijapur Guest House.
33 09 Feb 2024 Manoj Barthwal Comments Application Forwarded to Parkeen Team.
34 09 Feb 2024 Manoj Barthwal Acknowledged Application Acknoledged.
35 20 Jan 2024 Kedar Singh Reverted Letter No. and date of experience certificate in Sl. No. 5 is not mentioned. Experience certificates mentioned from s.no. 1 to 5 are not in the prescribed format. Salary slip of technical staff is not uploaded.
36 11 Jan 2024 Yogamber Singh Rawat Comments Application Forwarded to Parkeen Team.
37 11 Jan 2024 Yogamber Singh Rawat Acknowledged Application Acknoledged.
38 09 Jan 2024 Kedar Singh Reverted Character certificate has expired. 2. Solvency certificate has expired. 3.Experience certificates mentioned from s.no. 1 to 5 are not in the prescribed format. 4. Degree certificate of Mr. Rajendra kumar has not been submitted. 5. Pay slip of engineers has not been submitted.
39 09 Jan 2024 Kedar Singh In-Process Mail Has been send for Verification of work SPRM YOJNA RANI POKHRI HAT BAZAR PUNARDWAR EVAM CENTRE NIRMAN
40 18 Dec 2023 Kedar Singh Reverted 1. Character certificate has expired. 2. Solvency certificate has expired. 3.Experience certificates mentioned from s.no. 1 to 5 are not in the prescribed format. 4. Degree certificate of Mr. Rajendra kumar has not been submitted. 5. Pay slip of engineers has not been submitted.
41 12 Dec 2023 Rachana Thapliyal Submitted @Anand Singh Manral(010091895) ji, Application has been forwarded to you, kindly do the needfull. comments : Please inform the applicant of the following issues in his application: 1. Character certificate has expired. 2. Solvency certificate has expired. 3.Experience certificates mentioned from s.no. 1 to 5 are not in the prescribed format. 4. Degree certificate of Mr. Rajendra kumar has not been submitted. 5. Pay slip of engineers has not been submitted.
42 06 Dec 2023 Kedar Singh In-Process Mail Has been send for Verification of work DISTRICT DEHRADUN OLD BIJAPUR CONSTRUCTION OF EXTRA ROOMS
43 06 Dec 2023 Kedar Singh In-Process Mail Has been send for Verification of work RENOVATION OF SPECIALITY PRODUCT LAB
44 06 Dec 2023 Kedar Singh In-Process Mail Has been send for Verification of work BIJAPUR GUEST HOUSE CM SECURITY, OSD, SACHIV ROOM, TOILET ETC.
45 06 Dec 2023 Kedar Singh In-Process Mail Has been send for Verification of work POLICE BAL ADHUNIKIKARAN YOJNA YEAR 2013_14 FOR I E D MODLE ROOM
46 06 Dec 2023 Kedar Singh In-Process Mail Has been send for Verification of work BIJAPUR GUEST HOUSE EXTRA ROOMS, FANCING, WATERPROOFING AND SEVER LINE SHIFTING
47 06 Dec 2023 Kedar Singh In-Process Mail Has been send for Verification of work SPRM YOJNA RANI POKHRI HAT BAZAR PUNARDWAR EVAM CENTRE NIRMAN
48 22 Nov 2023 Kedar Singh Comments @Rachana Thapliyal(360019156) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Ma'am, 1. Affidavit of technical staff from the contractor or affidavit from technical staff is not uploaded. 2. Technical staff Shri Rejendra kumar degree is not uploaded. 3. BOQ of experience certificate is not uploaded by the contractor.
49 09 Nov 2023 Yogamber Singh Rawat Comments Application Forwarded to Parkeen Team.
50 09 Nov 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.