Contractor Application No. 76454 for Category Bridge Class A Applied Office : E-n-C Office Applied On Date : 14 Sep 2023

18 Mar 2024

Status : Registration Granted

By: Om Prakash

Approved as per comment of officer dated 11.03.2024

11 Mar 2024

Status : In-Process

By: Manoj Kumar Bisht

@Om Prakash(010099553) ji, Application has been forwarded to you, kindly do the needfull. comments : Sir, Registration may be granted

28 Feb 2024

Status : In-Process

By: Deepak Kumar

@Manoj Kumar Bisht(010096004) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय ठेकेदार/फर्म द्वारा अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है। अतः पंजीकरण हेतु विचार करना चाहें।

14 Feb 2024

Status : In-Process

By: Basant Lal

@Deepak Kumar(42009820) ji, Application has been forwarded to you, kindly do the needfull. comments : , कृपया ठेकेदार/फर्म द्वारा अपलोड किये गये अभिलेखों में अनुभव प्रमाण पत्र एवं बैंक सैल्वेसी प्रमाण पत्र का सत्यापन प्राप्त हो चुका है। अतः पंजीकरण हेतु विचार करना चाहें।

12 Feb 2024

Status : In-Process

By: Narendra Pant

@Basant Lal(010022168) ji, Application has been forwarded to you, kindly do the needfull. comments : वरिष्ठ प्रशासनिक अधिकारी महोदय, कृपया ठेकेदार/फर्म द्वारा अपलोड किये गये अभिलेखों में अनुभव प्रमाण पत्र एवं बैंक सैल्वेसी प्रमाण पत्र का सत्यापन प्राप्त हो चुका है। अतः पंजीकरण हेतु विचार करना चाहें।

12 Feb 2024

Status : In-Process

By: Narendra Pant

work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4 has been approved by Narendra Pant

12 Feb 2024

Status : In-Process

By: Narendra Pant

work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR. has been approved by Narendra Pant

12 Jan 2024

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4

12 Jan 2024

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.

29 Dec 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4

29 Dec 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.

29 Dec 2023

Status : In-Process

By: Narendra Pant

work Work of 30 mtr, steel girder in km. 4 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna has been approved by Narendra Pant

29 Dec 2023

Status : In-Process

By: Narendra Pant

work Work of 30 mtr, steel girder in km. 5 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna has been approved by Narendra Pant

29 Dec 2023

Status : In-Process

By: Narendra Pant

work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan. has been approved by Narendra Pant

28 Dec 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.

16 Dec 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4

16 Dec 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.

16 Dec 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.

20 Nov 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.

20 Nov 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.

20 Nov 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4

10 Nov 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4

10 Nov 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.

10 Nov 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.

26 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 4 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna

26 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 5 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna

26 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4

26 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.

26 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.

20 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 4 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna

20 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 5 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna

20 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4

20 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.

20 Oct 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.

26 Sep 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 5 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna

26 Sep 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 4 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna

26 Sep 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4

26 Sep 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.

26 Sep 2023

Status : In-Process

By: Narendra Pant

Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.

15 Sep 2023

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 3 Team.

15 Sep 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

15 Sep 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 18 Mar 2024 Om Prakash Registration Granted Approved as per comment of officer dated 11.03.2024
2 11 Mar 2024 Manoj Kumar Bisht In-Process @Om Prakash(010099553) ji, Application has been forwarded to you, kindly do the needfull. comments : Sir, Registration may be granted
3 28 Feb 2024 Deepak Kumar In-Process @Manoj Kumar Bisht(010096004) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय ठेकेदार/फर्म द्वारा अपलोड किये गये अभिलेखों का सत्यापन प्राप्त हो चुका है। अतः पंजीकरण हेतु विचार करना चाहें।
4 14 Feb 2024 Basant Lal In-Process @Deepak Kumar(42009820) ji, Application has been forwarded to you, kindly do the needfull. comments : , कृपया ठेकेदार/फर्म द्वारा अपलोड किये गये अभिलेखों में अनुभव प्रमाण पत्र एवं बैंक सैल्वेसी प्रमाण पत्र का सत्यापन प्राप्त हो चुका है। अतः पंजीकरण हेतु विचार करना चाहें।
5 12 Feb 2024 Narendra Pant In-Process @Basant Lal(010022168) ji, Application has been forwarded to you, kindly do the needfull. comments : वरिष्ठ प्रशासनिक अधिकारी महोदय, कृपया ठेकेदार/फर्म द्वारा अपलोड किये गये अभिलेखों में अनुभव प्रमाण पत्र एवं बैंक सैल्वेसी प्रमाण पत्र का सत्यापन प्राप्त हो चुका है। अतः पंजीकरण हेतु विचार करना चाहें।
6 12 Feb 2024 Narendra Pant In-Process work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4 has been approved by Narendra Pant
7 12 Feb 2024 Narendra Pant In-Process work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR. has been approved by Narendra Pant
8 12 Jan 2024 Narendra Pant In-Process Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4
9 12 Jan 2024 Narendra Pant In-Process Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.
10 29 Dec 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4
11 29 Dec 2023 Narendra Pant In-Process Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.
12 29 Dec 2023 Narendra Pant In-Process work Work of 30 mtr, steel girder in km. 4 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna has been approved by Narendra Pant
13 29 Dec 2023 Narendra Pant In-Process work Work of 30 mtr, steel girder in km. 5 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna has been approved by Narendra Pant
14 29 Dec 2023 Narendra Pant In-Process work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan. has been approved by Narendra Pant
15 28 Dec 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.
16 16 Dec 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4
17 16 Dec 2023 Narendra Pant In-Process Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.
18 16 Dec 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.
19 20 Nov 2023 Narendra Pant In-Process Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.
20 20 Nov 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.
21 20 Nov 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4
22 10 Nov 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4
23 10 Nov 2023 Narendra Pant In-Process Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.
24 10 Nov 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.
25 26 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 4 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna
26 26 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 5 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna
27 26 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4
28 26 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.
29 26 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.
30 20 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 4 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna
31 20 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 5 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna
32 20 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4
33 20 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.
34 20 Oct 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.
35 26 Sep 2023 Narendra Pant In-Process Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 5 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna
36 26 Sep 2023 Narendra Pant In-Process Mail Has been send for Verification of work Work of 30 mtr, steel girder in km. 4 of Lasi Sartoli motor road under Pradhan Mantri Gram Sadak Yojna
37 26 Sep 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction and maintenance of 18mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 9 & construction and maintenance of 48 mtr. span steel truss bridge at Gorpa Sirwadi_Kurchola in km. 4
38 26 Sep 2023 Narendra Pant In-Process Mail Has been send for Verification of work 30 mtr. span steel girder bridge over Hilau Gaad at km 0.750 of Tuneta to Bharanga MR.
39 26 Sep 2023 Narendra Pant In-Process Mail Has been send for Verification of work Construction of motor bridge near Tilwara Bhardar Sorakhal motor road km. 27 HM 8_10 under district plan.
40 15 Sep 2023 Yogamber Singh Rawat Comments Application Forwarded to Niyojan 3 Team.
41 15 Sep 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
42 15 Sep 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.