Contractor Application No. 70214 for Category Bridge Class A Applied Office : E-n-C Office Applied On Date : 11 Aug 2023

17 Aug 2023

Status : Registration Granted

By: Dayanand

Approved.

17 Aug 2023

Status : In-Process

By: Vishal Sharma

@Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : sir, docs submitted bt applicant got verified by section. applicant has requested to furnish ITR of AY 2023-24 after audit. hence may be considered for renewal under cat A of bridge works.

17 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

@Vishal Sharma(0700701) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय, मैसर्स शिवालिक इन्फ्रावेन्चर्स प्रा0लि0 द्वारा अपलोड़ प्रार्थना पत्र दिनांक 11.08.2023 द्वारा निम्नवत् अवगत कराया गया हैः- 1.प्रार्थी की फर्म मै0 शिवालिक इन्फ्रावेन्चर्स प्रा0लि0 का पंजीकृत कार्यालय-ई0-15/2, श्रीराम गली, भागीरथी विहार, गोकुलपुरी, नई दिल्ली है तथा शाखा कार्यालय (1) 12, अहमद बाग, सहारनपुर, उत्तर प्रदेश (2) 176, रेस कोर्स, देहरादून, उत्तराखण्ड में है। पंजीकरण से सम्बन्धित पत्र व्यवहार हमारे शाखा कार्यालय-12, अहमद बाग, सहारनपुर, उत्तर प्रदेश से करने की कृपा करें। 2. प्रार्थी की फर्म मै0 शिवालिक इन्फ्रावेन्चर्स प्रा0लि0 द्वारा वर्ष 2023-24 की आई0टी0आर0 अभी जमा नही की गई है जिसकी जमा करने की अवधि दिनांक 30.09.2023 तक है। अतः वर्ष 2023-24 की आई0टी0आर0 30 सितम्बर, 2023 से पूर्व हमारे द्वारा आपके कार्यालय में प्रस्तुत कर दिया जायेगा। 3. प्रार्थी की फर्म मै0 शिवालिक इन्फ्रावेन्चर्स प्रा0 लि0 द्वारा अनुभव प्रमाण संख्या 03 कार्य का नाम ‘‘स्पेशल कम्पोनेन्ट प्लान के अन्तर्गत जनपद हरिद्वार के भगवानपुर ब्लाॅक में हरिजन बाहुल्य क्षेत्र में बंजारेवाला से तेलपुरा-खेड़ी शिकोहपुर-हल्जौरा-बुग्गावाला-फिरोजपुर मोटर मार्ग के कि0मी0 8 में 285 मीटर लम्बाई के सेतु की आर0सी0सी0 बाॅक्स टाईप एप्रोच मार्ग का निर्माण कार्य।’’ का है। उपरोक्त कार्य नहीं में होने के कारण 15 मी0 गहरी पाईल डालकर आर0सी0सी0 बाॅक्स टाईप पहुॅच मार्ग का निर्माण कार्य किया गया जो सेतु का ही भाग है। निविदा के समय निविदा की श्रेणी A/A+in Bridge में थी जिसकी पुष्टि अधिशासी अभियन्ता, प्रान्तीय खण्ड, लोक निर्माण विभाग, देवपुरा, हरिद्वार ने अपने कार्यालय पत्र संख्या 1700/1A दिनांक 06.08.2020 (प्रति संलग्न) द्वारा की है। अतः पंजीकरण करने पर विचार करना चाहें।

17 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK has been approved by Ramesh Chand Joshi

17 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK

16 Aug 2023

Status : In-Process

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

16 Aug 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

11 Aug 2023

Status : Reverted

By: Ramesh Chand Joshi

कृपया अवगत कराना है कि आपके द्वारा वित्तीय वर्ष 2023-2024 की आई0टी0आर0 दाखिल की प्रति अपलोड़ नहीं की गयी है, तथा आपके द्वारा अनुबन्ध जो क्रमांक 03 पर अपलोड किया गया है वह पुल का ना होकर एप्रोच रोड़ का है इस सम्बन्ध में उपरोक्त कमियों का निराकरण कर आवश्यक कार्यवाही करने का कष्ट करें।

10 Aug 2023

Status : In-Process

By: Vishal Sharma

@Ramesh Chand Joshi(010086713) ji, Application has been forwarded to you, kindly do the needfull. comments : comment over latest ITR and two different addresses of applicant. exp certificate no 3 is of approach road of the bridge...is it adequate ?

07 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

@Vishal Sharma(0700701) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय, कृपया कम्पनी/ठेकेदार द्वारा प्रस्तुत अभिलेखों का आॅनलाईन/आॅफलाईन सत्यापन प्राप्त हो गये है। कृपया कम्पनी/ठेकेदार का सेतु कार्यो हेतु श्रेणी ‘ए’ में पंजीकरण करने पर विचार करना चाहे।

07 Aug 2023

Status : In-Process

By: Soban Singh

@Ramesh Chand Joshi(010086713) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय, कृपया कम्पनी/ठेकेदार द्वारा प्रस्तुत अभिलेखों का आॅनलाईन/आॅफलाईन सत्यापन प्राप्त हो गये है। कृपया कम्पनी/ठेकेदार का सेतु कार्यो हेतु श्रेणी ‘ए’ में पंजीकरण करने पर विचार करना चाहे।

07 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

work STRENGTHING WORK BY BM/SDBC OF KALSI CHAKRATA M/RCSH_20 IN CONSTIUENCCY CHAKRATA IN DISTRICK DEHRADUN UNDER ISP PLAN. has been approved by Ramesh Chand Joshi

07 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

work IMPROVEMENT WIDENING TO 2 LANE WITH PAVED SHOULDER INCLUDING MAJOR BRIDGE & PROTECTIN WORK OF PALIGAAD MARKET ON HILL SIDE AND VALLEY SIDE FROM KM 196 TO 197 IF BG_94 has been approved by Ramesh Chand Joshi

07 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK has been approved by Ramesh Chand Joshi

07 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

work CONSTRUCTION OF 30 M RCC MOTOR BRIDGE AT KM 43.50 OF NH 707A IN THE STATE OF UTTARAKHAND UNDER ANNUAL PLAN 2016_17 SUPERINTENDENT ENGINEER 10TH CIRCLE PWD DOIWALA. has been approved by Ramesh Chand Joshi

07 Aug 2023

Status : In-Process

By: Ramesh Chand Joshi

work CONSTRUCTION OF 15 M SPAN RCC MOTOR BRIDGE AT KM 144 (CH 143.090) OF NH 707A IN THE STATE OF UTTARAKHAND UNDER ANNUAL PLAN 2017_18 has been approved by Ramesh Chand Joshi

31 Jul 2023

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work IMPROVEMENT WIDENING TO 2 LANE WITH PAVED SHOULDER INCLUDING MAJOR BRIDGE & PROTECTIN WORK OF PALIGAAD MARKET ON HILL SIDE AND VALLEY SIDE FROM KM 196 TO 197 IF BG_94

31 Jul 2023

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK

31 Jul 2023

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK

20 Jun 2023

Status : In-Process

By: Soban Singh

Mail Has been send for Verification of work IMPROVEMENT WIDENING TO 2 LANE WITH PAVED SHOULDER INCLUDING MAJOR BRIDGE & PROTECTIN WORK OF PALIGAAD MARKET ON HILL SIDE AND VALLEY SIDE FROM KM 196 TO 197 IF BG_94

20 Jun 2023

Status : In-Process

By: Soban Singh

Mail Has been send for Verification of work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK

20 Jun 2023

Status : In-Process

By: Soban Singh

Mail Has been send for Verification of work STRENGTHING WORK BY BM/SDBC OF KALSI CHAKRATA M/RCSH_20 IN CONSTIUENCCY CHAKRATA IN DISTRICK DEHRADUN UNDER ISP PLAN.

20 Jun 2023

Status : In-Process

By: Soban Singh

Mail Has been send for Verification of work CONSTRUCTION OF 15 M SPAN RCC MOTOR BRIDGE AT KM 144 (CH 143.090) OF NH 707A IN THE STATE OF UTTARAKHAND UNDER ANNUAL PLAN 2017_18

20 Jun 2023

Status : In-Process

By: Soban Singh

Mail Has been send for Verification of work CONSTRUCTION OF 30 M RCC MOTOR BRIDGE AT KM 43.50 OF NH 707A IN THE STATE OF UTTARAKHAND UNDER ANNUAL PLAN 2016_17 SUPERINTENDENT ENGINEER 10TH CIRCLE PWD DOIWALA.

16 Jun 2023

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

16 Jun 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

13 Jun 2023

Status : Reverted

By: Soban Singh

कृपया आपके द्वारा अपलोड तकनीकी स्टाफ में श्री महेश प्रसाद डिग्री होल्डर किसी अन्य ठेकेदार के साथ भी तकनीकी स्टाॅफ के रूप में कार्यरत है। जो कि मान्य नहीं है।

13 Jun 2023

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

13 Jun 2023

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 17 Aug 2023 Dayanand Registration Granted Approved.
2 17 Aug 2023 Vishal Sharma In-Process @Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : sir, docs submitted bt applicant got verified by section. applicant has requested to furnish ITR of AY 2023-24 after audit. hence may be considered for renewal under cat A of bridge works.
3 17 Aug 2023 Ramesh Chand Joshi In-Process @Vishal Sharma(0700701) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय, मैसर्स शिवालिक इन्फ्रावेन्चर्स प्रा0लि0 द्वारा अपलोड़ प्रार्थना पत्र दिनांक 11.08.2023 द्वारा निम्नवत् अवगत कराया गया हैः- 1.प्रार्थी की फर्म मै0 शिवालिक इन्फ्रावेन्चर्स प्रा0लि0 का पंजीकृत कार्यालय-ई0-15/2, श्रीराम गली, भागीरथी विहार, गोकुलपुरी, नई दिल्ली है तथा शाखा कार्यालय (1) 12, अहमद बाग, सहारनपुर, उत्तर प्रदेश (2) 176, रेस कोर्स, देहरादून, उत्तराखण्ड में है। पंजीकरण से सम्बन्धित पत्र व्यवहार हमारे शाखा कार्यालय-12, अहमद बाग, सहारनपुर, उत्तर प्रदेश से करने की कृपा करें। 2. प्रार्थी की फर्म मै0 शिवालिक इन्फ्रावेन्चर्स प्रा0लि0 द्वारा वर्ष 2023-24 की आई0टी0आर0 अभी जमा नही की गई है जिसकी जमा करने की अवधि दिनांक 30.09.2023 तक है। अतः वर्ष 2023-24 की आई0टी0आर0 30 सितम्बर, 2023 से पूर्व हमारे द्वारा आपके कार्यालय में प्रस्तुत कर दिया जायेगा। 3. प्रार्थी की फर्म मै0 शिवालिक इन्फ्रावेन्चर्स प्रा0 लि0 द्वारा अनुभव प्रमाण संख्या 03 कार्य का नाम ‘‘स्पेशल कम्पोनेन्ट प्लान के अन्तर्गत जनपद हरिद्वार के भगवानपुर ब्लाॅक में हरिजन बाहुल्य क्षेत्र में बंजारेवाला से तेलपुरा-खेड़ी शिकोहपुर-हल्जौरा-बुग्गावाला-फिरोजपुर मोटर मार्ग के कि0मी0 8 में 285 मीटर लम्बाई के सेतु की आर0सी0सी0 बाॅक्स टाईप एप्रोच मार्ग का निर्माण कार्य।’’ का है। उपरोक्त कार्य नहीं में होने के कारण 15 मी0 गहरी पाईल डालकर आर0सी0सी0 बाॅक्स टाईप पहुॅच मार्ग का निर्माण कार्य किया गया जो सेतु का ही भाग है। निविदा के समय निविदा की श्रेणी A/A+in Bridge में थी जिसकी पुष्टि अधिशासी अभियन्ता, प्रान्तीय खण्ड, लोक निर्माण विभाग, देवपुरा, हरिद्वार ने अपने कार्यालय पत्र संख्या 1700/1A दिनांक 06.08.2020 (प्रति संलग्न) द्वारा की है। अतः पंजीकरण करने पर विचार करना चाहें।
4 17 Aug 2023 Ramesh Chand Joshi In-Process work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK has been approved by Ramesh Chand Joshi
5 17 Aug 2023 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK
6 16 Aug 2023 Yogamber Singh Rawat In-Process Application Forwarded to Vidhi Team.
7 16 Aug 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
8 11 Aug 2023 Ramesh Chand Joshi Reverted कृपया अवगत कराना है कि आपके द्वारा वित्तीय वर्ष 2023-2024 की आई0टी0आर0 दाखिल की प्रति अपलोड़ नहीं की गयी है, तथा आपके द्वारा अनुबन्ध जो क्रमांक 03 पर अपलोड किया गया है वह पुल का ना होकर एप्रोच रोड़ का है इस सम्बन्ध में उपरोक्त कमियों का निराकरण कर आवश्यक कार्यवाही करने का कष्ट करें।
9 10 Aug 2023 Vishal Sharma In-Process @Ramesh Chand Joshi(010086713) ji, Application has been forwarded to you, kindly do the needfull. comments : comment over latest ITR and two different addresses of applicant. exp certificate no 3 is of approach road of the bridge...is it adequate ?
10 07 Aug 2023 Ramesh Chand Joshi In-Process @Vishal Sharma(0700701) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय, कृपया कम्पनी/ठेकेदार द्वारा प्रस्तुत अभिलेखों का आॅनलाईन/आॅफलाईन सत्यापन प्राप्त हो गये है। कृपया कम्पनी/ठेकेदार का सेतु कार्यो हेतु श्रेणी ‘ए’ में पंजीकरण करने पर विचार करना चाहे।
11 07 Aug 2023 Soban Singh In-Process @Ramesh Chand Joshi(010086713) ji, Application has been forwarded to you, kindly do the needfull. comments : महोदय, कृपया कम्पनी/ठेकेदार द्वारा प्रस्तुत अभिलेखों का आॅनलाईन/आॅफलाईन सत्यापन प्राप्त हो गये है। कृपया कम्पनी/ठेकेदार का सेतु कार्यो हेतु श्रेणी ‘ए’ में पंजीकरण करने पर विचार करना चाहे।
12 07 Aug 2023 Ramesh Chand Joshi In-Process work STRENGTHING WORK BY BM/SDBC OF KALSI CHAKRATA M/RCSH_20 IN CONSTIUENCCY CHAKRATA IN DISTRICK DEHRADUN UNDER ISP PLAN. has been approved by Ramesh Chand Joshi
13 07 Aug 2023 Ramesh Chand Joshi In-Process work IMPROVEMENT WIDENING TO 2 LANE WITH PAVED SHOULDER INCLUDING MAJOR BRIDGE & PROTECTIN WORK OF PALIGAAD MARKET ON HILL SIDE AND VALLEY SIDE FROM KM 196 TO 197 IF BG_94 has been approved by Ramesh Chand Joshi
14 07 Aug 2023 Ramesh Chand Joshi In-Process work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK has been approved by Ramesh Chand Joshi
15 07 Aug 2023 Ramesh Chand Joshi In-Process work CONSTRUCTION OF 30 M RCC MOTOR BRIDGE AT KM 43.50 OF NH 707A IN THE STATE OF UTTARAKHAND UNDER ANNUAL PLAN 2016_17 SUPERINTENDENT ENGINEER 10TH CIRCLE PWD DOIWALA. has been approved by Ramesh Chand Joshi
16 07 Aug 2023 Ramesh Chand Joshi In-Process work CONSTRUCTION OF 15 M SPAN RCC MOTOR BRIDGE AT KM 144 (CH 143.090) OF NH 707A IN THE STATE OF UTTARAKHAND UNDER ANNUAL PLAN 2017_18 has been approved by Ramesh Chand Joshi
17 31 Jul 2023 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work IMPROVEMENT WIDENING TO 2 LANE WITH PAVED SHOULDER INCLUDING MAJOR BRIDGE & PROTECTIN WORK OF PALIGAAD MARKET ON HILL SIDE AND VALLEY SIDE FROM KM 196 TO 197 IF BG_94
18 31 Jul 2023 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK
19 31 Jul 2023 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK
20 20 Jun 2023 Soban Singh In-Process Mail Has been send for Verification of work IMPROVEMENT WIDENING TO 2 LANE WITH PAVED SHOULDER INCLUDING MAJOR BRIDGE & PROTECTIN WORK OF PALIGAAD MARKET ON HILL SIDE AND VALLEY SIDE FROM KM 196 TO 197 IF BG_94
21 20 Jun 2023 Soban Singh In-Process Mail Has been send for Verification of work UNDER SPECIAL COMPNET ZONE IN HARIDWAR , BHAGWANPUR BLOCK TO BANJAROWALA TO TELPURA KHEDI SHIKHOPUR HALJORA BUGGAWALA FIROZPUR MOTOR BRIDGE KM 8 , 285 M LENGTH CONSTRUCTION WORK
22 20 Jun 2023 Soban Singh In-Process Mail Has been send for Verification of work STRENGTHING WORK BY BM/SDBC OF KALSI CHAKRATA M/RCSH_20 IN CONSTIUENCCY CHAKRATA IN DISTRICK DEHRADUN UNDER ISP PLAN.
23 20 Jun 2023 Soban Singh In-Process Mail Has been send for Verification of work CONSTRUCTION OF 15 M SPAN RCC MOTOR BRIDGE AT KM 144 (CH 143.090) OF NH 707A IN THE STATE OF UTTARAKHAND UNDER ANNUAL PLAN 2017_18
24 20 Jun 2023 Soban Singh In-Process Mail Has been send for Verification of work CONSTRUCTION OF 30 M RCC MOTOR BRIDGE AT KM 43.50 OF NH 707A IN THE STATE OF UTTARAKHAND UNDER ANNUAL PLAN 2016_17 SUPERINTENDENT ENGINEER 10TH CIRCLE PWD DOIWALA.
25 16 Jun 2023 Yogamber Singh Rawat Comments Application Forwarded to Vidhi Team.
26 16 Jun 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.
27 13 Jun 2023 Soban Singh Reverted कृपया आपके द्वारा अपलोड तकनीकी स्टाफ में श्री महेश प्रसाद डिग्री होल्डर किसी अन्य ठेकेदार के साथ भी तकनीकी स्टाॅफ के रूप में कार्यरत है। जो कि मान्य नहीं है।
28 13 Jun 2023 Yogamber Singh Rawat Comments Application Forwarded to Vidhi Team.
29 13 Jun 2023 Yogamber Singh Rawat Acknowledged Application Acknoledged.