1 |
19 Aug 2023
|
Kedar Singh
|
Registration Granted
|
FDR has been re-Uploaded for Application
|
2 |
10 Jul 2023
|
Girish Chandra Arya
|
Registration Granted
|
Approved as per approval, verification and recommendation of concern officers and employees.
|
3 |
10 Jul 2023
|
Prem Singh Nabiyal
|
In-Process
|
@Girish Chandra Arya(010099552) ji, Application has been forwarded to you, kindly do the needfull. comments : As per the recommendation of EE the approval for registration in Road Class A category may be accorded
|
4 |
06 Jul 2023
|
Balram Misra
|
In-Process
|
@Prem Singh Nabiyal(570068221) ji, Application has been forwarded to you, kindly do the needfull. comments : Sir, verification of documents done by SAO.अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।
|
5 |
06 Jul 2023
|
Kedar Singh
|
In-Process
|
@Balram Misra(420010048) ji, Application has been forwarded to you, kindly do the needfull. comments : EE Sir सत्यापन की कार्यवाही पूर्ण हो चूकी है। अतः विभाग में ठेकेदारों की सूची श्रेण ‘‘ए’’ में Road कार्य हेतु पंजीकरण करना चाहें। कृपया आदेशार्थ प्रस्तुत।
|
6 |
01 Jul 2023
|
Kedar Singh
|
In-Process
|
work Repair work by WBM of road surface from Radhav vihar T_point to smith nagar T_point and metro plaza Gadaria mohalla to smith nagar T_point damaged due to road cutting for laying drinking water pipeline under Gehunwala Cluster Drinking water scheme has been approved by Kedar Singh
|
7 |
01 Jul 2023
|
Kedar Singh
|
In-Process
|
work Road repair work from Shimla bypass road towards tuntowala badri chowk, damaged by pipeline laid by menhuwala chuster scheme in Chandrabani under road cutting has been approved by Kedar Singh
|
8 |
01 Jul 2023
|
Kedar Singh
|
In-Process
|
work Construction of link road from km 4.00 of Barotiwala_vikasnagar road to udayabagh and from main road to Shiv Mandir and house of Asharam panuli etc has been approved by Kedar Singh
|
9 |
01 Jul 2023
|
Kedar Singh
|
In-Process
|
work work of interlocking tiles from vikasnagar motor road to Telpura dandi and other internal roads of gram panchayat has been approved by Kedar Singh
|
10 |
01 Jul 2023
|
Kedar Singh
|
In-Process
|
work Construction work of Babugarh_Nawabgarh_jeevangarh and dakpathar area internal roads and drains in vidhansabha vikasnagar of dehradun district under state plan. has been approved by Kedar Singh
|
11 |
14 Jun 2023
|
Kedar Singh
|
In-Process
|
Mail Has been send for Verification of work Repair work by WBM of road surface from Radhav vihar T_point to smith nagar T_point and metro plaza Gadaria mohalla to smith nagar T_point damaged due to road cutting for laying drinking water pipeline under Gehunwala Cluster Drinking water scheme
|
12 |
14 Jun 2023
|
Kedar Singh
|
In-Process
|
Mail Has been send for Verification of work Road repair work from Shimla bypass road towards tuntowala badri chowk, damaged by pipeline laid by menhuwala chuster scheme in Chandrabani under road cutting
|
13 |
14 Jun 2023
|
Kedar Singh
|
In-Process
|
Mail Has been send for Verification of work Construction of link road from km 4.00 of Barotiwala_vikasnagar road to udayabagh and from main road to Shiv Mandir and house of Asharam panuli etc
|
14 |
14 Jun 2023
|
Kedar Singh
|
In-Process
|
Mail Has been send for Verification of work work of interlocking tiles from vikasnagar motor road to Telpura dandi and other internal roads of gram panchayat
|
15 |
14 Jun 2023
|
Kedar Singh
|
In-Process
|
Mail Has been send for Verification of work Construction work of Babugarh_Nawabgarh_jeevangarh and dakpathar area internal roads and drains in vidhansabha vikasnagar of dehradun district under state plan.
|
16 |
13 Jun 2023
|
Yogamber Singh Rawat
|
Comments
|
Application Forwarded to Parkeen Team.
|
17 |
13 Jun 2023
|
Yogamber Singh Rawat
|
Acknowledged
|
Application Acknoledged.
|