Dashboard Contractor Registration

Contractor Application No. 45530 for Category Road Class A Applied Office : E-n-C Office Applied On Date : 28 Jul 2022

15 Sep 2022

Status : Registration Granted

By: Jaypal Singh Rawat

FDR has been re-Uploaded for Application

14 Sep 2022

Status : In-Process

By: Ashok Kumar

@Anil Kumar Pangty(010096073) ji, Application has been forwarded to you, kindly do the needfull. comments : FDR has not been uploaded. Please upload it.

12 Sep 2022

Status : Registration Granted

By: Jaypal Singh Rawat

FDR has been re-Uploaded for Application

11 Sep 2022

Status : In-Process

By: Ashok Kumar

@Anil Kumar Pangty(010096073) ji, Application has been forwarded to you, kindly do the needfull. comments : Verification process is not proper. In the email being sent to bank, FDR details should be clearly mentioned by HoD office. So, verify again. And make a habit of this in all other cases also.

03 Aug 2022

Status : Registration Granted

By: Ashok Kumar

Approved provisionally

02 Aug 2022

Status : In-Process

By: Anil Kumar Pangty

@Ashok Kumar(42270213M00002) ji, Application has been forwarded to you, kindly do the needfull. comments : मुख्य अभियंता (नि) सत्यापन की कार्यवाही पूर्ण हो चूकी है, श्रेणी ए में मार्ग कार्य हेतु पंजीकरण की कार्यवाही की सकती है। अवलाकनार्थ/आदेशार्थ प्रस्तुत

01 Aug 2022

Status : In-Process

By: Yogamber Singh Rawat

@Anil Kumar Pangty(010096073) ji, Application has been forwarded to you, kindly do the needfull. comments : S.S.O. कृप्या आदेर्शाथ।

30 Jul 2022

Status : In-Process

By: Jagdish Prasad Sati

CAO, श्री जगदीश चन्द्र भटट कोटेश्वर पो0ओ0 जागेश्वर जिला अल्मोडा द्वारा मार्ग कार्य श्रेणी ए में पंजीकरण के नवीनीकरण किये जाने हेतु आवेदन किया गया है । श्री भटट् द्वारा प्रस्तुत अनुभव/चरित्र/हैसियत/तकनीकी स्टाफ का सत्यापन कर लिया गया है । अवगत कराना है कि श्री जगदीश चन्द्र भट्ट का मार्ग कार्य श्रेणी ए में दि0 30.6.2022 तक पंजीकरण किया गया था । अतः श्री भटट् का मार्ग कार्य श्रेणी में पंजीकरण का नवीनीकरण करना चाहें । अवलोकनार्थ/आदेशार्थ प्रस्तुत ।

29 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

वरिष्ठ प्रशासनिक अधिकारी श्री जगदीश चन्द्र भटट कोटेश्वर पो0ओ0 जागेश्वर जिला अल्मोडा द्वारा मार्ग कार्य श्रेणी ए में पंजीकरण के नवीनीकरण किये जाने हेतु आवेदन किया गया है । श्री भटट् द्वारा प्रस्तुत अनुभव/चरित्र/हैसियत/तकनीकी स्टाफ का सत्यापन कर लिया गया है । अवगत कराना है कि श्री जगदीश चन्द्र भट्ट का मार्ग कार्य श्रेणी ए में दि0 30.6.2022 तक पंजीकरण किया गया था । अतः श्री भटट् का मार्ग कार्य श्रेणी में पंजीकरण का नवीनीकरण करना चाहें । अवलोकनार्थ/आदेशार्थ प्रस्तुत ।

29 Jul 2022

Status : In-Process

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 2 Team.

29 Jul 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

28 Jul 2022

Status : Reverted

By: Jaypal Singh Rawat

आपके द्वारा तकनीकी स्टाफ श्री अनिरूद्व नौटियाल की डेट आॅफ रेगुलर की तिथि 01.01.1990 अंकित की गई है । स्पष्ट करें ।

28 Jul 2022

Status : In-Process

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 2 Team.

28 Jul 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

27 Jul 2022

Status : Reverted

By: Jagdish Prasad Sati

तकनीकी स्टाफ के रूप में श्री मुकुल नेगी आपकी फर्म के साथ-साथ किसी अन्य के साथ भी कार्य कर रहे है।

26 Jul 2022

Status : In-Process

By: Anil Kumar Pangty

मुकुल सिंह नेगी दो ठेकेदरों के साथ कार्य करना दर्शाया गया है। 1. मै. जगदीश चन्द्र भट्ट 2. मै. राजेन्द्र भट्ट वापस करें।

23 Jul 2022

Status : In-Process

By: Yogamber Singh Rawat

S.S.O. कृप्या आदेर्शाथ।

22 Jul 2022

Status : In-Process

By: Jagdish Prasad Sati

CAO, श्री जगदीश चन्द्र भटट् ग्राम कोटेश्वर पो0ओ0 जागेश्वर जिला बागेश्वर द्वारा मार्ग कार्य श्रेणी ए में पंजीकरण के नवीनीकरण किये जाने हेतु आवेदन किया गया है । ठेकेदार द्वारा प्रस्तु अनुभव /हैसियत/चरित्र प्रमाण पत्र/तकनीकी स्टाफ का सत्यापन कर लिया गया है । अतः श्री जगदीश चन्द्र भट्ट का मार्ग कार्य श्रेणी ए में पंजीकरण का नवीनीकरण करना चाहें ।

22 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

वरिष्ठ प्रशासनिक अधिकारी, श्री जगदीश चन्द्र भटट् ग्राम कोटेश्वर पो0ओ0 जागेश्वर जिला बागेश्वर द्वारा मार्ग कार्य श्रेणी ए में पंजीकरण के नवीनीकरण किये जाने हेतु आवेदन किया गया है । ठेकेदार द्वारा प्रस्तु अनुभव /हैसियत/चरित्र प्रमाण पत्र/तकनीकी स्टाफ का सत्यापन कर लिया गया है । अतः श्री जगदीश चन्द्र भट्ट का मार्ग कार्य श्रेणी ए में पंजीकरण का नवीनीकरण करना चाहें ।

22 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

work Under state plan, The New construction work of km. 1.5 to 5.00 of the Dhyadi Mirgaon motor road has been approved by Jaypal Singh Rawat

22 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

work Construction on CC road from Vijaypur_Patiya_Kasoon road gate to Mahendra Pandey shop under District Plan. has been approved by Jaypal Singh Rawat

22 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

work Bc work in Budhad_Miroli Motor Road in km. 3 has been approved by Jaypal Singh Rawat

22 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

work BC work in Budhad_Miroli motor road on km. 2 has been approved by Jaypal Singh Rawat

22 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan. has been approved by Jaypal Singh Rawat

11 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.

11 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.

08 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Under state plan, The New construction work of km. 1.5 to 5.00 of the Dhyadi Mirgaon motor road

08 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Construction on CC road from Vijaypur_Patiya_Kasoon road gate to Mahendra Pandey shop under District Plan.

08 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Bc work in Budhad_Miroli Motor Road in km. 3

08 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work BC work in Budhad_Miroli motor road on km. 2

08 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.

05 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work BC work in Budhad_Miroli motor road on km. 2

05 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Bc work in Budhad_Miroli Motor Road in km. 3

05 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Construction on CC road from Vijaypur_Patiya_Kasoon road gate to Mahendra Pandey shop under District Plan.

05 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Under state plan, The New construction work of km. 1.5 to 5.00 of the Dhyadi Mirgaon motor road

05 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.

04 Jul 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 2 Team.

04 Jul 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

02 Jul 2022

Status : Reverted

By: Jaypal Singh Rawat

अनुभव प्रमाण पत्र ठीक से अपलोड नहीं किये गये है ।

02 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Bc work in Budhad_Miroli Motor Road in km. 3

02 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Bc work in Budhad_Miroli Motor Road in km. 3

02 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Construction on CC road from Vijaypur_Patiya_Kasoon road gate to Mahendra Pandey shop under District Plan.

02 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Improvement work on Sunoli_Darmaad motor road Dwarahat under Almora district

02 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work BC work in Budhad_Miroli motor road on km. 2

02 Jul 2022

Status : In-Process

By: Jaypal Singh Rawat

Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.

01 Jul 2022

Status : Comments

By: Anil Kumar Pangty

अनुभव प्रमाण पत्रों को सत्यापन करें

30 Jun 2022

Status : Comments

By: Jagdish Prasad Sati

फर्म/ठेकेदार द्वारा प्रस्तुत किये गये अनुभव प्रमाण पत्रों को सत्यापन हेतु सम्बन्धित खण्डों को प्रेषित करना चाहें। आदेशार्थ प्रस्तुत।

25 Jun 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Niyojan 2 Team.

25 Jun 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 15 Sep 2022 Jaypal Singh Rawat Registration Granted FDR has been re-Uploaded for Application
2 14 Sep 2022 Ashok Kumar In-Process @Anil Kumar Pangty(010096073) ji, Application has been forwarded to you, kindly do the needfull. comments : FDR has not been uploaded. Please upload it.
3 12 Sep 2022 Jaypal Singh Rawat Registration Granted FDR has been re-Uploaded for Application
4 11 Sep 2022 Ashok Kumar In-Process @Anil Kumar Pangty(010096073) ji, Application has been forwarded to you, kindly do the needfull. comments : Verification process is not proper. In the email being sent to bank, FDR details should be clearly mentioned by HoD office. So, verify again. And make a habit of this in all other cases also.
5 03 Aug 2022 Ashok Kumar Registration Granted Approved provisionally
6 02 Aug 2022 Anil Kumar Pangty In-Process @Ashok Kumar(42270213M00002) ji, Application has been forwarded to you, kindly do the needfull. comments : मुख्य अभियंता (नि) सत्यापन की कार्यवाही पूर्ण हो चूकी है, श्रेणी ए में मार्ग कार्य हेतु पंजीकरण की कार्यवाही की सकती है। अवलाकनार्थ/आदेशार्थ प्रस्तुत
7 01 Aug 2022 Yogamber Singh Rawat In-Process @Anil Kumar Pangty(010096073) ji, Application has been forwarded to you, kindly do the needfull. comments : S.S.O. कृप्या आदेर्शाथ।
8 30 Jul 2022 Jagdish Prasad Sati In-Process CAO, श्री जगदीश चन्द्र भटट कोटेश्वर पो0ओ0 जागेश्वर जिला अल्मोडा द्वारा मार्ग कार्य श्रेणी ए में पंजीकरण के नवीनीकरण किये जाने हेतु आवेदन किया गया है । श्री भटट् द्वारा प्रस्तुत अनुभव/चरित्र/हैसियत/तकनीकी स्टाफ का सत्यापन कर लिया गया है । अवगत कराना है कि श्री जगदीश चन्द्र भट्ट का मार्ग कार्य श्रेणी ए में दि0 30.6.2022 तक पंजीकरण किया गया था । अतः श्री भटट् का मार्ग कार्य श्रेणी में पंजीकरण का नवीनीकरण करना चाहें । अवलोकनार्थ/आदेशार्थ प्रस्तुत ।
9 29 Jul 2022 Jaypal Singh Rawat In-Process वरिष्ठ प्रशासनिक अधिकारी श्री जगदीश चन्द्र भटट कोटेश्वर पो0ओ0 जागेश्वर जिला अल्मोडा द्वारा मार्ग कार्य श्रेणी ए में पंजीकरण के नवीनीकरण किये जाने हेतु आवेदन किया गया है । श्री भटट् द्वारा प्रस्तुत अनुभव/चरित्र/हैसियत/तकनीकी स्टाफ का सत्यापन कर लिया गया है । अवगत कराना है कि श्री जगदीश चन्द्र भट्ट का मार्ग कार्य श्रेणी ए में दि0 30.6.2022 तक पंजीकरण किया गया था । अतः श्री भटट् का मार्ग कार्य श्रेणी में पंजीकरण का नवीनीकरण करना चाहें । अवलोकनार्थ/आदेशार्थ प्रस्तुत ।
10 29 Jul 2022 Yogamber Singh Rawat In-Process Application Forwarded to Niyojan 2 Team.
11 29 Jul 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
12 28 Jul 2022 Jaypal Singh Rawat Reverted आपके द्वारा तकनीकी स्टाफ श्री अनिरूद्व नौटियाल की डेट आॅफ रेगुलर की तिथि 01.01.1990 अंकित की गई है । स्पष्ट करें ।
13 28 Jul 2022 Yogamber Singh Rawat In-Process Application Forwarded to Niyojan 2 Team.
14 28 Jul 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
15 27 Jul 2022 Jagdish Prasad Sati Reverted तकनीकी स्टाफ के रूप में श्री मुकुल नेगी आपकी फर्म के साथ-साथ किसी अन्य के साथ भी कार्य कर रहे है।
16 26 Jul 2022 Anil Kumar Pangty In-Process मुकुल सिंह नेगी दो ठेकेदरों के साथ कार्य करना दर्शाया गया है। 1. मै. जगदीश चन्द्र भट्ट 2. मै. राजेन्द्र भट्ट वापस करें।
17 23 Jul 2022 Yogamber Singh Rawat In-Process S.S.O. कृप्या आदेर्शाथ।
18 22 Jul 2022 Jagdish Prasad Sati In-Process CAO, श्री जगदीश चन्द्र भटट् ग्राम कोटेश्वर पो0ओ0 जागेश्वर जिला बागेश्वर द्वारा मार्ग कार्य श्रेणी ए में पंजीकरण के नवीनीकरण किये जाने हेतु आवेदन किया गया है । ठेकेदार द्वारा प्रस्तु अनुभव /हैसियत/चरित्र प्रमाण पत्र/तकनीकी स्टाफ का सत्यापन कर लिया गया है । अतः श्री जगदीश चन्द्र भट्ट का मार्ग कार्य श्रेणी ए में पंजीकरण का नवीनीकरण करना चाहें ।
19 22 Jul 2022 Jaypal Singh Rawat In-Process वरिष्ठ प्रशासनिक अधिकारी, श्री जगदीश चन्द्र भटट् ग्राम कोटेश्वर पो0ओ0 जागेश्वर जिला बागेश्वर द्वारा मार्ग कार्य श्रेणी ए में पंजीकरण के नवीनीकरण किये जाने हेतु आवेदन किया गया है । ठेकेदार द्वारा प्रस्तु अनुभव /हैसियत/चरित्र प्रमाण पत्र/तकनीकी स्टाफ का सत्यापन कर लिया गया है । अतः श्री जगदीश चन्द्र भट्ट का मार्ग कार्य श्रेणी ए में पंजीकरण का नवीनीकरण करना चाहें ।
20 22 Jul 2022 Jaypal Singh Rawat In-Process work Under state plan, The New construction work of km. 1.5 to 5.00 of the Dhyadi Mirgaon motor road has been approved by Jaypal Singh Rawat
21 22 Jul 2022 Jaypal Singh Rawat In-Process work Construction on CC road from Vijaypur_Patiya_Kasoon road gate to Mahendra Pandey shop under District Plan. has been approved by Jaypal Singh Rawat
22 22 Jul 2022 Jaypal Singh Rawat In-Process work Bc work in Budhad_Miroli Motor Road in km. 3 has been approved by Jaypal Singh Rawat
23 22 Jul 2022 Jaypal Singh Rawat In-Process work BC work in Budhad_Miroli motor road on km. 2 has been approved by Jaypal Singh Rawat
24 22 Jul 2022 Jaypal Singh Rawat In-Process work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan. has been approved by Jaypal Singh Rawat
25 11 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.
26 11 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.
27 08 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Under state plan, The New construction work of km. 1.5 to 5.00 of the Dhyadi Mirgaon motor road
28 08 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Construction on CC road from Vijaypur_Patiya_Kasoon road gate to Mahendra Pandey shop under District Plan.
29 08 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Bc work in Budhad_Miroli Motor Road in km. 3
30 08 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work BC work in Budhad_Miroli motor road on km. 2
31 08 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.
32 05 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work BC work in Budhad_Miroli motor road on km. 2
33 05 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Bc work in Budhad_Miroli Motor Road in km. 3
34 05 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Construction on CC road from Vijaypur_Patiya_Kasoon road gate to Mahendra Pandey shop under District Plan.
35 05 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Under state plan, The New construction work of km. 1.5 to 5.00 of the Dhyadi Mirgaon motor road
36 05 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.
37 04 Jul 2022 Yogamber Singh Rawat Comments Application Forwarded to Niyojan 2 Team.
38 04 Jul 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
39 02 Jul 2022 Jaypal Singh Rawat Reverted अनुभव प्रमाण पत्र ठीक से अपलोड नहीं किये गये है ।
40 02 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Bc work in Budhad_Miroli Motor Road in km. 3
41 02 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Bc work in Budhad_Miroli Motor Road in km. 3
42 02 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Construction on CC road from Vijaypur_Patiya_Kasoon road gate to Mahendra Pandey shop under District Plan.
43 02 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Improvement work on Sunoli_Darmaad motor road Dwarahat under Almora district
44 02 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work BC work in Budhad_Miroli motor road on km. 2
45 02 Jul 2022 Jaypal Singh Rawat In-Process Mail Has been send for Verification of work Extension of Kheti_Jateshwar motor Road in Almora District under State Plan.
46 01 Jul 2022 Anil Kumar Pangty Comments अनुभव प्रमाण पत्रों को सत्यापन करें
47 30 Jun 2022 Jagdish Prasad Sati Comments फर्म/ठेकेदार द्वारा प्रस्तुत किये गये अनुभव प्रमाण पत्रों को सत्यापन हेतु सम्बन्धित खण्डों को प्रेषित करना चाहें। आदेशार्थ प्रस्तुत।
48 25 Jun 2022 Yogamber Singh Rawat Comments Application Forwarded to Niyojan 2 Team.
49 25 Jun 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.