Contractor Application No. 41508 for Category Road Class A Applied Office : E-n-C Office Applied On Date : 03 Jun 2022

16 Aug 2022

Status : In-Process

By: Mukesh Singh Parmar

@Ashok Kumar(42270213M00002) ji, Application has been forwarded to you, kindly do the needfull. comments : Dear Sir, Canara Bank merger with Syndicate Bank ( anchor bank- Canara Bank). The mergers took effect from 1 April 2020.

02 Aug 2022

Status : In-Process

By: Ashok Kumar

@Mukesh Singh Parmar(010099551) ji, Application has been forwarded to you, kindly do the needfull. comments : FDR is of Syndicate Bank but verification process has been done from Canara Bank.

01 Aug 2022

Status : Registration Granted

By: Ramesh Chand Joshi

FDR has been re-Uploaded for Application

24 Jul 2022

Status : In-Process

By: Ashok Kumar

1. Verification of FDR has been done in the year 2019, in the name of Jagdish Singh while registration is being sought in the name of Jitendra Singh. Verify it correctly. 2. Also clarify whether the current application is for registration or for renewal of registration. 3. If it is renewal, what's the validity of registration ?

30 Jun 2022

Status : Registration Granted

By: KHAGENDRA PRASAD UPRETI

Approved

30 Jun 2022

Status : In-Process

By: Yogamber Singh Rawat

S.S.O. Sir कृप्या आदेर्शाथ।

30 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

महोदय, कृपया सम्बन्धित ठेकेदार की सत्यापन आख्यायें प्राप्त हो चुकी है। अतः पंजीकरण करने पर विचार करना चाहें।

30 Jun 2022

Status : In-Process

By: Soban Singh

महोदय, कृपया सम्बन्धित ठेकेदार की सत्यापन आख्यायें प्राप्त हो चुकी है। अतः पंजीकरण करने पर विचार करना चाहें।

30 Jun 2022

Status : In-Process

By: Soban Singh

work UNDER AR 2021_22 KE ANTARGAT JANPAD CHAMOLI KE VIKASKHAND KARNPRAYAG_ NAUTI_PAITHANI MOTOR MARG (SH34) KE KM 4,5,8 AND 9 ME SDBC DWARA NAVINIKARAN KARYA has been approved by Soban Singh

30 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

work UT_03_01 PERIODIC RENEWAL OF HELUNG TO URGAM M/R WITH 2 YEARS ROUTINE MAINTENANCE has been approved by Ramesh Chand Joshi

30 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

work UNDER AR 2020_21 KE ANTARGAT GOPESHWAR_DEWARKHADORA MOTOR MARG PAR S.D.B.C DWARA NAVINIKARAN KA KARYA has been approved by Ramesh Chand Joshi

30 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

work UNDER SPECIALSPAR 2020_21 POKHARI_GOPESHWAR MOTOR ROAD KM 49(10MTR) 50 TO 60, 61(250MTR) RENEWAL BY S.D.B.C has been approved by Ramesh Chand Joshi

30 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

work UNDER SPECIAL ASSISTANCE SCHEME 2020_21 IMPROVEMENT WORK BY BC OF LISA FACTORY GOPESHWAR TO DIRECTOR WILD ANIMAL OFFICER MOTOR ROAD(LENGTH 1.75KM) GOPESHWAR INTERNAL MOTOR ROAD (LENGTH 4.80KM) KOTHIYALSAIN_SAWARISAIN_NANDPRAYAG MOTOR ROAD(LENTH 11.00KM) KARNPRAYAG_NAUTI _PAITHANI OTOR ROAD (LENGTH 11.00KM) PANCHPULIYA INTERNAL MOTOR ROAD (LENGTH 1.00KM) PACHPULIYA TO UPPER MARKET MOTOR ROAD(LENGTH1.35KM) has been approved by Ramesh Chand Joshi

28 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UT_03_01 PERIODIC RENEWAL OF HELUNG TO URGAM M/R WITH 2 YEARS ROUTINE MAINTENANCE

10 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UT_03_01 PERIODIC RENEWAL OF HELUNG TO URGAM M/R WITH 2 YEARS ROUTINE MAINTENANCE

10 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER AR 2021_22 KE ANTARGAT JANPAD CHAMOLI KE VIKASKHAND KARNPRAYAG_ NAUTI_PAITHANI MOTOR MARG (SH34) KE KM 4,5,8 AND 9 ME SDBC DWARA NAVINIKARAN KARYA

10 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER AR 2020_21 KE ANTARGAT GOPESHWAR_DEWARKHADORA MOTOR MARG PAR S.D.B.C DWARA NAVINIKARAN KA KARYA

10 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER SPECIALSPAR 2020_21 POKHARI_GOPESHWAR MOTOR ROAD KM 49(10MTR) 50 TO 60, 61(250MTR) RENEWAL BY S.D.B.C

10 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER SPECIAL ASSISTANCE SCHEME 2020_21 IMPROVEMENT WORK BY BC OF LISA FACTORY GOPESHWAR TO DIRECTOR WILD ANIMAL OFFICER MOTOR ROAD(LENGTH 1.75KM) GOPESHWAR INTERNAL MOTOR ROAD (LENGTH 4.80KM) KOTHIYALSAIN_SAWARISAIN_NANDPRAYAG MOTOR ROAD(LENTH 11.00KM) KARNPRAYAG_NAUTI _PAITHANI OTOR ROAD (LENGTH 11.00KM) PANCHPULIYA INTERNAL MOTOR ROAD (LENGTH 1.00KM) PACHPULIYA TO UPPER MARKET MOTOR ROAD(LENGTH1.35KM)

10 Jun 2022

Status : Comments

By: Mukesh Singh Parmar

सत्यापन की कार्यवाही करें।

06 Jun 2022

Status : Comments

By: Ramesh Chand Joshi

महोदय कृपया ठेकेदार द्वारा अपलोड किये गये अभिलेख चरित्र/हैसियत/अनुभव प्रमाण पत्रों का सत्यापन करने पर विचार करना चाहे।

04 Jun 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

04 Jun 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

04 Jun 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

03 Jun 2022

Status : Reverted

By: Ramesh Chand Joshi

कृपया आपके द्वारा पंजीकरण किये जाने हेतु अपलोड की गयी मशीनरी में लोडर (जे0सी0बी0) 02 के स्थान पर 01 अंकित की गयी है। जबकि 02 लोडर(जे0सी0बी0) अंकित होनी है।

03 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UT_03_01 PERIODIC RENEWAL OF HELUNG TO URGAM M/R WITH 2 YEARS ROUTINE MAINTENANCE

03 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER AR 2020_21 KE ANTARGAT GOPESHWAR_DEWARKHADORA MOTOR MARG PAR S.D.B.C DWARA NAVINIKARAN KA KARYA

03 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER SPECIALSPAR 2020_21 POKHARI_GOPESHWAR MOTOR ROAD KM 49(10MTR) 50 TO 60, 61(250MTR) RENEWAL BY S.D.B.C

03 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER SPECIAL ASSISTANCE SCHEME 2020_21 IMPROVEMENT WORK BY BC OF LISA FACTORY GOPESHWAR TO DIRECTOR WILD ANIMAL OFFICER MOTOR ROAD(LENGTH 1.75KM) GOPESHWAR INTERNAL MOTOR ROAD (LENGTH 4.80KM) KOTHIYALSAIN_SAWARISAIN_NANDPRAYAG MOTOR ROAD(LENTH 11.00KM) KARNPRAYAG_NAUTI _PAITHANI OTOR ROAD (LENGTH 11.00KM) PANCHPULIYA INTERNAL MOTOR ROAD (LENGTH 1.00KM) PACHPULIYA TO UPPER MARKET MOTOR ROAD(LENGTH1.35KM)

03 Jun 2022

Status : In-Process

By: Ramesh Chand Joshi

Mail Has been send for Verification of work UNDER AR 2021_22 KE ANTARGAT JANPAD CHAMOLI KE VIKASKHAND KARNPRAYAG_ NAUTI_PAITHANI MOTOR MARG (SH34) KE KM 4,5,8 AND 9 ME SDBC DWARA NAVINIKARAN KARYA

28 May 2022

Status : Comments

By: Mukesh Singh Parmar

sapyapan ki karvahi kre

21 May 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

21 May 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

21 May 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

21 May 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.

21 May 2022

Status : Reverted

By: Soban Singh

कृपया पंजीकरण हेतु प्रस्तुत आवेदन पर दस्तावेज अपलोड नहीं है।

18 May 2022

Status : Comments

By: Yogamber Singh Rawat

Application Forwarded to Vidhi Team.

18 May 2022

Status : Acknowledged

By: Yogamber Singh Rawat

Application Acknoledged.


Sl No On Date Officer Status Remarks
1 16 Aug 2022 Mukesh Singh Parmar In-Process @Ashok Kumar(42270213M00002) ji, Application has been forwarded to you, kindly do the needfull. comments : Dear Sir, Canara Bank merger with Syndicate Bank ( anchor bank- Canara Bank). The mergers took effect from 1 April 2020.
2 02 Aug 2022 Ashok Kumar In-Process @Mukesh Singh Parmar(010099551) ji, Application has been forwarded to you, kindly do the needfull. comments : FDR is of Syndicate Bank but verification process has been done from Canara Bank.
3 01 Aug 2022 Ramesh Chand Joshi Registration Granted FDR has been re-Uploaded for Application
4 24 Jul 2022 Ashok Kumar In-Process 1. Verification of FDR has been done in the year 2019, in the name of Jagdish Singh while registration is being sought in the name of Jitendra Singh. Verify it correctly. 2. Also clarify whether the current application is for registration or for renewal of registration. 3. If it is renewal, what's the validity of registration ?
5 30 Jun 2022 KHAGENDRA PRASAD UPRETI Registration Granted Approved
6 30 Jun 2022 Yogamber Singh Rawat In-Process S.S.O. Sir कृप्या आदेर्शाथ।
7 30 Jun 2022 Ramesh Chand Joshi In-Process महोदय, कृपया सम्बन्धित ठेकेदार की सत्यापन आख्यायें प्राप्त हो चुकी है। अतः पंजीकरण करने पर विचार करना चाहें।
8 30 Jun 2022 Soban Singh In-Process महोदय, कृपया सम्बन्धित ठेकेदार की सत्यापन आख्यायें प्राप्त हो चुकी है। अतः पंजीकरण करने पर विचार करना चाहें।
9 30 Jun 2022 Soban Singh In-Process work UNDER AR 2021_22 KE ANTARGAT JANPAD CHAMOLI KE VIKASKHAND KARNPRAYAG_ NAUTI_PAITHANI MOTOR MARG (SH34) KE KM 4,5,8 AND 9 ME SDBC DWARA NAVINIKARAN KARYA has been approved by Soban Singh
10 30 Jun 2022 Ramesh Chand Joshi In-Process work UT_03_01 PERIODIC RENEWAL OF HELUNG TO URGAM M/R WITH 2 YEARS ROUTINE MAINTENANCE has been approved by Ramesh Chand Joshi
11 30 Jun 2022 Ramesh Chand Joshi In-Process work UNDER AR 2020_21 KE ANTARGAT GOPESHWAR_DEWARKHADORA MOTOR MARG PAR S.D.B.C DWARA NAVINIKARAN KA KARYA has been approved by Ramesh Chand Joshi
12 30 Jun 2022 Ramesh Chand Joshi In-Process work UNDER SPECIALSPAR 2020_21 POKHARI_GOPESHWAR MOTOR ROAD KM 49(10MTR) 50 TO 60, 61(250MTR) RENEWAL BY S.D.B.C has been approved by Ramesh Chand Joshi
13 30 Jun 2022 Ramesh Chand Joshi In-Process work UNDER SPECIAL ASSISTANCE SCHEME 2020_21 IMPROVEMENT WORK BY BC OF LISA FACTORY GOPESHWAR TO DIRECTOR WILD ANIMAL OFFICER MOTOR ROAD(LENGTH 1.75KM) GOPESHWAR INTERNAL MOTOR ROAD (LENGTH 4.80KM) KOTHIYALSAIN_SAWARISAIN_NANDPRAYAG MOTOR ROAD(LENTH 11.00KM) KARNPRAYAG_NAUTI _PAITHANI OTOR ROAD (LENGTH 11.00KM) PANCHPULIYA INTERNAL MOTOR ROAD (LENGTH 1.00KM) PACHPULIYA TO UPPER MARKET MOTOR ROAD(LENGTH1.35KM) has been approved by Ramesh Chand Joshi
14 28 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UT_03_01 PERIODIC RENEWAL OF HELUNG TO URGAM M/R WITH 2 YEARS ROUTINE MAINTENANCE
15 10 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UT_03_01 PERIODIC RENEWAL OF HELUNG TO URGAM M/R WITH 2 YEARS ROUTINE MAINTENANCE
16 10 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER AR 2021_22 KE ANTARGAT JANPAD CHAMOLI KE VIKASKHAND KARNPRAYAG_ NAUTI_PAITHANI MOTOR MARG (SH34) KE KM 4,5,8 AND 9 ME SDBC DWARA NAVINIKARAN KARYA
17 10 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER AR 2020_21 KE ANTARGAT GOPESHWAR_DEWARKHADORA MOTOR MARG PAR S.D.B.C DWARA NAVINIKARAN KA KARYA
18 10 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER SPECIALSPAR 2020_21 POKHARI_GOPESHWAR MOTOR ROAD KM 49(10MTR) 50 TO 60, 61(250MTR) RENEWAL BY S.D.B.C
19 10 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER SPECIAL ASSISTANCE SCHEME 2020_21 IMPROVEMENT WORK BY BC OF LISA FACTORY GOPESHWAR TO DIRECTOR WILD ANIMAL OFFICER MOTOR ROAD(LENGTH 1.75KM) GOPESHWAR INTERNAL MOTOR ROAD (LENGTH 4.80KM) KOTHIYALSAIN_SAWARISAIN_NANDPRAYAG MOTOR ROAD(LENTH 11.00KM) KARNPRAYAG_NAUTI _PAITHANI OTOR ROAD (LENGTH 11.00KM) PANCHPULIYA INTERNAL MOTOR ROAD (LENGTH 1.00KM) PACHPULIYA TO UPPER MARKET MOTOR ROAD(LENGTH1.35KM)
20 10 Jun 2022 Mukesh Singh Parmar Comments सत्यापन की कार्यवाही करें।
21 06 Jun 2022 Ramesh Chand Joshi Comments महोदय कृपया ठेकेदार द्वारा अपलोड किये गये अभिलेख चरित्र/हैसियत/अनुभव प्रमाण पत्रों का सत्यापन करने पर विचार करना चाहे।
22 04 Jun 2022 Yogamber Singh Rawat Comments Application Forwarded to Vidhi Team.
23 04 Jun 2022 Yogamber Singh Rawat Comments Application Forwarded to Vidhi Team.
24 04 Jun 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
25 03 Jun 2022 Ramesh Chand Joshi Reverted कृपया आपके द्वारा पंजीकरण किये जाने हेतु अपलोड की गयी मशीनरी में लोडर (जे0सी0बी0) 02 के स्थान पर 01 अंकित की गयी है। जबकि 02 लोडर(जे0सी0बी0) अंकित होनी है।
26 03 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UT_03_01 PERIODIC RENEWAL OF HELUNG TO URGAM M/R WITH 2 YEARS ROUTINE MAINTENANCE
27 03 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER AR 2020_21 KE ANTARGAT GOPESHWAR_DEWARKHADORA MOTOR MARG PAR S.D.B.C DWARA NAVINIKARAN KA KARYA
28 03 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER SPECIALSPAR 2020_21 POKHARI_GOPESHWAR MOTOR ROAD KM 49(10MTR) 50 TO 60, 61(250MTR) RENEWAL BY S.D.B.C
29 03 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER SPECIAL ASSISTANCE SCHEME 2020_21 IMPROVEMENT WORK BY BC OF LISA FACTORY GOPESHWAR TO DIRECTOR WILD ANIMAL OFFICER MOTOR ROAD(LENGTH 1.75KM) GOPESHWAR INTERNAL MOTOR ROAD (LENGTH 4.80KM) KOTHIYALSAIN_SAWARISAIN_NANDPRAYAG MOTOR ROAD(LENTH 11.00KM) KARNPRAYAG_NAUTI _PAITHANI OTOR ROAD (LENGTH 11.00KM) PANCHPULIYA INTERNAL MOTOR ROAD (LENGTH 1.00KM) PACHPULIYA TO UPPER MARKET MOTOR ROAD(LENGTH1.35KM)
30 03 Jun 2022 Ramesh Chand Joshi In-Process Mail Has been send for Verification of work UNDER AR 2021_22 KE ANTARGAT JANPAD CHAMOLI KE VIKASKHAND KARNPRAYAG_ NAUTI_PAITHANI MOTOR MARG (SH34) KE KM 4,5,8 AND 9 ME SDBC DWARA NAVINIKARAN KARYA
31 28 May 2022 Mukesh Singh Parmar Comments sapyapan ki karvahi kre
32 21 May 2022 Yogamber Singh Rawat Comments Application Forwarded to Vidhi Team.
33 21 May 2022 Yogamber Singh Rawat Comments Application Forwarded to Vidhi Team.
34 21 May 2022 Yogamber Singh Rawat Comments Application Forwarded to Vidhi Team.
35 21 May 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.
36 21 May 2022 Soban Singh Reverted कृपया पंजीकरण हेतु प्रस्तुत आवेदन पर दस्तावेज अपलोड नहीं है।
37 18 May 2022 Yogamber Singh Rawat Comments Application Forwarded to Vidhi Team.
38 18 May 2022 Yogamber Singh Rawat Acknowledged Application Acknoledged.